Focusing Change To Win Series – How Can You Lead to Thrive?

Series Introduction

This is the eighth in the series of highlighting contributions from 1072 Business Leaders and Consultants from 80 countries in 19 Industry Sectors detailed in our book Focusing Change to Win. Each blog gives some of the key findings and a sample of useful tips. In this blog we are focusing on How Can You Lead to Thrive? Here are the other book sections we are highlighting:

  1. Why is this book important?
  2. How is your “What” connected to your “Why”?
  3. Why do people resist change?
  4. Why bother measuring change?
  5. How can implementing change gain competitive advantage?
  6. Is your organization thriving or surviving?
  7. How effectively are you communicating change?
  8. How can you lead to thrive?

 

8. How Can You Lead to Thrive?

Clearly from this survey, leadership skills that focus change to win are at a premium. Today, change is the norm. It is neither random nor regular but hovers somewhere between. How these interrelationships arise and how they challenge organizations is not well understood (IBM & KMPG Surveys endorse this)

Why should leaders focus on their organization’s essence?

An organization’s essence is the amalgam of mission, vision, values, intent and ethics. These components should be the focus of aligning and realigning people rather than delivering the corporate directives after a strategic planning retreat. Sustaining an organization’s essence is a dynamic that requires everyone’s engagement to define and redefine under changing situations.

It’s only by leaders “inter-reacting” that they can develop people’s shared clarity about the organization’s essence – “what we stand for!” From shared clarity comes confidence, from confidence comes cohesion and from cohesion comes the freedom to decide and act. That’s how organizations will stay on track today. Many people making many decisions true to their organization’s essence.

It’s also expected that some employees (including some executives) will not “buy into” an organization’s Essence once it is clearly defined.  Leaders should then be ready for those employees and managers to transition out of the organization. This will benefit them and organizational cohesion

What are the dangers of using technology to increase control?

Technology increases the illusion of greater control which can feed a leader’s “Control Addiction”. More measurement equals more control. But measuring what is easy to measure can have the very opposite effect. The problem is that most of what is easy to measure has already occurred. What is difficult is dealing with the factors that are difficult to measure and with forecasting what is likely to happen down the road. We can’t spend more time looking through the “rear view mirror” when we have a winding road ahead of us. Technology’s cheapness and speed feeds this addiction with the past and “looking in the rear view mirror” by access to ever more data and information at the cost of acquiring knowledge and wisdom.

This condition is worsened by technologists clinging to largely sequential design and deployment processes which are not fully user or client inclusive, e.g. “Waterfall Process”.  Contrast this with agile processes which are fully supported by our contributors. See the link to comparing the Waterfall Process with Agile Methodologies.

Why do we have difficulty developing leaders that can thrive in today’s conditions?

Today’s conditions are not good proving grounds for the leaders we need. More of doing more with less, multi-tasking and the growing doubt that we may be doing the wrong things means that decision-making, and expectations are now more compressed. Consequently, entrenched expediency leads us into solving one problem so quickly that we find we have now created five more problems. We are so busy trying to solve problems there’s no time for “Where the hell are we going?” These conditions are not good for selecting or developing leaders who can work well under fluid and complex conditions.

How do we develop leaders that can thrive?

The tension between what Leaders want to achieve and their current culture prevents traditional leadership training from making a significant impact. For example, many leaders’ previous training has left them feeling that they could do a better job doing it themselves. Of course, too often this has not happened together with little sign that they have addressed their own or their junior leaders’ performance issues. The consequence is that leading up to a change they lack confidence and skills to handle the natural uncertainty that change creates. Consequently, they default to avoidance and expediency and as a result staff resistance rises morale suffers.

The conclusion is that Leaders need to develop a better framework to assess their competence to lead people, make the next and later changes more effectively.

In this section we outline how leaders can be developed to increase their chances of achieving both measurable short- and longer term results than traditional leadership training. It is based on approaches:

  • Aligning People – Getting people on the Same Page
  • Action Learning – Solving Difficult Problems while developing leaders’ skills

A Final Thought

Our position is that it’s only by energizing people and harnessing technologies better than anyone else that organizations can survive and thrive. Genuinely aligned, empowered and collaborative people will outperform the competition every time. A leader’s role is to create successful change that fulfills people and avoids human casualties. Leaders need to create working relationships that are rewarding not just superficially productive.

Action Points 7: Leading to Thrive

A Leader’s greatest impact is when they motivate their followers to action by appealing to their shared sense of their organization’s essence. Use these questions to rate your leaders’ abilities:

  • To what extent do your leaders focused on developing rewarding not just working relationships?
  • How reliant are your leaders on “command and control”?
  • How well do they really engage those they lead?
  • How well do they foster a culture of collaboration? Consider both internally and externally.

Leading to the Essence

Do your people know what your organization stands for? Specifically:

  • How well understood is the organization’s essence? (mission, values, intent and ethics)
  • How well aligned are my people with the Organization’s Essence and where it’s headed?
  • To what extent do leaders use the essence to guide and coach their people?

Developing Leaders

  • To what extent are you distributing and empowering leaders at all levels.
  • What evidence do you see of true “inter-reaction” where success and failure are openly discussed?
  • To what extent do they then take lessons learned and use them to repeat success and avoid failure.
  • How well do they use processes to help people stand back, objectify problems and make people’s thought processes transparent?
  • To what extent does the urgent drive out the important and mask how things accumulate, misalign and make each subsequent more difficult?

Problem Solving

  • How often do your leaders try to solve complex problems with processes geared to “benign or simple problems”?
  • How often do leaders face complex or wicked problems?

Leading Learning

  • What expectations do we have of people to develop shared knowledge from similar situations?
  • How much effort have you put into helping people express being puzzled or misunderstood?
  • How well do they lead people on tackling problems and solutions by sharing understandings, resolving differences and producing agreed courses of action?
  • How well have leaders, especially senior leaders, consistently expressed their expectations of learning to all levels across the organization?

To Buy a Copy of Focusing Change To Win: CreateSpace Buy Button

 

 

 

To Buy a Copy of Focusing Change To Win:

Developing Leaders for Effective Change

Leading in times of transition is at best a significant and complex challenge. At worst it can be a leader’s darkest nightmare. The tension between what leaders want to achieve and their organization’s culture often means that traditional leadership training has not equipped leaders to effectively lead the organization through major changes.
Too often previous leadership training and a history of failed change contribute to the tension between the forces for change and those for maintaining the status quo. Unfortunately, as each attempt to use training to improve leadership competence fails so do the chances of successful change decline.

One reason leadership training lacks impact (no matter how good) is the lack of rigorous and continuous linkage between advancing change and advancing competence. Consequently, leading up to a change, those expected to start the change become part of the problem, not the solution. Too often they are unable or unwilling to tackle rising uncertainty and resistance.

How can you re-engage managers and develop their leadership competence?
This blog looks at how you can develop both measurable short- and longer-term results based on:
1. Getting People On The Same Page by Aligning People and then;
2. Making Better Use of What You Have by using Action Learning to help managers solving difficult problems while developing their leaders’ skills.

Continue reading

Focusing Change To Win – How Effectively Are You Communicating Change?

Series Introduction

This is the seventh in the series of highlighting contributions from 1072 Business Leaders and Consultants from 80 countries in 19 Industry Sectors detailed in our book Focusing Change to Win. Each blog gives some of the key findings and a sample of useful tips. In this blog we are focusing on How Effectively Are You Communicating Change?   Here are the other book sections we are highlighting:

  1. Why is this book important?
  2. How is your “What” connected to your “Why”?
  3. Why do people resist change?
  4. Why bother measuring change?
  5. How can implementing change gain competitive advantage?
  6. Is your organization thriving or surviving?
  7. How effectively are you communicating change?
  8. How can you lead to thrive?

 

7. How Effectively Are You Communicating Change?  

The following is based on 684 contributors who chose to add comments on communicating change. Unsurprisingly, contributors see their people at the heart of any successful change process. They see gaining stakeholder commitment as a force multiplier of powerful change ambassadors. Essential to creating that commitment are leaders taking their people into their confidence with honesty and courage.

Surprisingly, however, our analysis also sheds light on some blind spots. Overall, contributors focus more on technique than systemic or strategic issues when communicating change. For example:

  •  They (Leaders) lack the ability to motivate or hold people accountable….they do a poor job at this…..lots of saying nothing….People are told, not asked. 

Change Communication Blind Spots

How do communicate change. Zone of Concern Chart

Real change requires authentic communication and dialogue across all organizational levels. Although, employee’s resistance and disagreement are unavoidable, contributors show how it can be managed through multiplexed and constant communication. They stress that this only happens when change communication is centered on establishing and retaining trusting relationships. If employees feel fairness, they will trust more and trust is the glue of success.

So, what role does communication play in reducing change mistrust and cynicism among employees? Frequently, it’s people’s sense of fairness. The communication timing, involvement and sequence impact their sense of justice.

Where’s the Requiring Environment?

Change-Requiring Environment

There seems little focus on improving alignment and change success. Issues like change management, communication, and change measurement were under 6% of contributors’ comments on communicating change.

Looking in more detail, a third of contributors said that they didn’t know of any change related communication or that their leaders don’t communicate enough.

For most contributors, real change is the outcome of authentic communication. They show how change can be managed through constant communication. Contributors often commented that trust in management was the only variable that significantly impacted change resistance.

However, comments on authentic communication and building trust seem to collide with those related to top down led change. Critical contributors point out that top down rests too often on leaders clinging to the belief that power, privilege and success lie in their core group. Whatever blend of top down and bottom up it is clear – one should be intentional and as one contributor said:

  • Being solid in the values you hold as a leader that needs clearly articulating and solidifying with your change management team before you start planning. 

Our contributors are clear. Lay the groundwork for successful change before trying to carry out the next change. This starts with putting the change management team together before a specific change is planned. Then develop a shared governing set of values and design the change measurement framework.

Implementing Effective Change Communication Processes – A Questionnaire 

This 38 question instrument was developed from 755 contributor comments on implementing an effective communication change process. It is designed to engage those involved in change management and leadership in selecting relevant questions and then reaching a consensus on improvement areas.

  • Analyzing Change Impacts
  • Set-up Change Program with Metrics
  • On-going Communication & Training

Action Points 6: Implementing an Effective Change-Communication Process

Based on your answers to the questionnaire above, use the following questions to develop your plan for developing effective change communication.

  • Have you established an explicit set of shared governing values?
  • How are you getting people ready for the inevitable change?
  • Have you engaged stakeholders and change agents?
  • Have you put the change-management team together?
  • How do plan to align the team’s values of change and their expectations of one another?
  • How are you going to improve leaders change communication skills?
  • Who is going to ensure that real change will be the outcome of authentic communication?
  • How are you going to ensure that all your people know and understand your change rationale?
  • How are you going to monitor employee’s sense of fairness and trust? (Remember: trust is the glue of success.)
  • How are you going to establish dialogue between groups and individuals, in often tense situations?
  • How are you going to establish and monitor your change’s requiring environment? Is there a set of aligned change expectations between leaders and each individual?

To buy a copy of Focusing Change To Win click: CreateSpace Buy Button

 

 

If you would like to contact Nick, please fill out the form below:

Focusing Change To Win – Is Your Organization Thriving or Just Surviving?

Series Introduction

This is the sixth in the series of highlighting contributions from 1072 Business Leaders and Consultants from 80 countries in 19 Industry Sectors detailed in our book Focusing Change to Win. Each blog gives some of the key findings and a sample of useful tips. In this blog we are focusing on Is Your Organization Thriving or Just Surviving? Here are the other book sections we are highlighting:

  1. Why is this book important?
  2. How is your “What” connected to your “Why”?
  3. Why do people resist change?
  4. Why bother measuring change?
  5. How can implementing change gain competitive advantage?
  6. Is your organization thriving or surviving?
  7. How effectively are you communicating change?
  8. How can you lead to thrive?

 

 

6. Is Your Organization Thriving or Just Surviving? 

This in-depth analysis shows the wide range of factors that go into developing the Thriving Organization. Our intent in being comprehensive is deliberate. We want leaders to select which questions are most appropriate to them.

Our reasoning is that there are no simple solutions or steps to follow. What we urge is open debate in leadership teams to reach a commitment to those few things which can make a difference between being ahead and just playing catch up.

Thriving or Surviving Questionnaire

Enabling Factors

There are 69 questions to select from divided into seven categories to help as you develop your plan for building a more vibrant and competitive organization.

  1.  Leadership in Thriving Organizations
  2. Change Management in Thriving Organizations
  3. Planning to Thrive 
  4. Agility to Thrive
  5. Thriving People
  6. Communicating to Thrive
  7. Learning to Thrive 

 

 

 

Action Points 5: Developing the Thriving Organization

Based on your answers to the questionnaire above, use the following questions to develop your plan for developing a more vibrant and competitive organization.

 

  1. Leadership in Thriving Organizations
  • What is the one thing you can do to improve your leaders focus for your current change?
  • What is your strategy for building leadership capacity and competence in the longer term?
  1. Change Management in Thriving Organizations
  • Which aspects of change management do you need to address now?
  • What are you going to do differently in managing change in the longer term?
  1. Planning to Thrive
  • How can you improve planning for change for the next time?
  1. Thriving People
  • In terms of the current change, what can you do to focus people on making this change successful?
  • What is your focus going to be in improving peoples change readiness and agility?
  1. Communicating to Thrive
  • Where do you need to focus in terms of improving communication?

To Buy a Copy of Focusing Change To Win: 

CreateSpace Buy Button

If you would like to contact Nick, please fill out the form below:

Tracking Expectations to Avoid IT Project Failure

(Abstract from Take Control of Your Project – Using Expectation Alignment to Avoid IT Project Failure by Terry Merriman, PCO Associates LLC)

Whether large or small, IT projects are complex change events. They need cross-functional collaboration between two or more departments or teams. Their success or failure reverberates throughout the organization and often impacts customers. Countless studies and papers on reasons for IT Project Failure cite two critical factors:

  • Poor interpersonal communications
  • Lack of professional project management

Numerous studies have shown that up to 70%  of IT projects fail. Over 20 years, Terry Merriman  and the other IT Project Failurecontributors to the White Paper – Using Expectation Alignment to Avoid IT Project Failure continue to uncover the usual cast of suspects like:

  • Customer requirements not being adequately defined
  • Customer requirements kept changing
  • Acceptance testing was slim to non-existent

These failure statistics are fully in line with the findings of the survey of 1072 business leaders and consultants summarized in my book Focusing Change to Win which I wrote with Kelly Nwosu.

How can that happen with professionals on both sides of the design effort? Weren’t they in the same meetings? What happened to the agreed requirements? testing regimens? and change request process?

Of course, they did all those things. What they didn’t realize is what they believed they understood of each other was at best misaligned. The IT professionals and the business professionals each assumed that the other understood the precise meaning with each communication; each assumed specific activities were part of the other person’s normal routine in a development project. So, projects failed to achieve the desired results due to::

  • Expectations not being made specific to the project or explicit to each other
  • Tasks not done as expected
  • Delivered Functionality did not meet expectations
  • Requirements weren’t met

If you are interested in having the authors speaking to your organization fill out this form.

Continue reading

How do you ensure New Hires can develop Sales Mastery?

Being competitive comes from people who are well aligned with their organization’s intent and mission. If you take that extra care to recruit and select such people, my question is:

How easy is it to waste the opportunity you have created?Avoiding Change Management Traps

Certainly, having faith that “they will get it” is not a strategy. Without real investment of your time, onboarding will be hit and miss. So, let’s look at that investment and how best spend time with New Hires. Continue reading

Rebuilding Trust is Productivity’s Cornerstone

Globally there is a slow erosion of those binding forces for people to “go that extra mile” . The employee-employer psychological contract is  degrading.  The degree to which people identify with their job and consider job performance as important to their self-worth is slipping .In our recently published survey Focusing Change to Win identified the main culprits:

  • Poor Planning
  • Lack of Leadership
  • Inconsistent leadership
  • Poor Implementation
  • Lack of Adaptability
  • Lack of Communication
  • Lack of Control

More than ever, we need to repair, build and protect the trust people have in their employers.

In North America, our evidence from 8 expectation alignment projects ranging from Royal Bank of Canada through Nature Conservancy to Turner Construction shows a clear trend. Leaders consistently under-estimate the gap between what they expect of their managers and what people think is expected of them. In all studies, leaders had 65%+ more expectations than their people were aware.

In the UK, managers need to do more if they want to earn employee trust , according to the latest survey into employee attitudes from the Chartered Institute of Personnel and Development (CIPD). Trust in senior management is declining, particularly in the private sector, with

  • Only 25% employees willing to place a lot of trust in senior management to look after their interests and
  • Only 41% placing little or no trust in them to do so.

Essentially, new research suggests that many employees are losing faith in their  management  yet it seems leaders have don’t connect this condition with losing ground competitively.  Continue reading

Realigning Schools for the New Normal – The Administrator’s Challenge

Introduction

At school and district levels, managing scarce resources to sustain or improve results has never been more Multiple Choice Testingchallenging. Striving for consistency and efficiency builds tensions between those who care most about equipping children for an uncertain future.

Increasingly critical eyes on the education system advocate blunt instruments like “stronger management”, more top-down management, tighter controls, and simple incentives. This is surprising since such methods are failing the private sector by dispiriting and limiting people’s contribution. So, why should we expect anything different in education?

This is aggravated by the economy. We simply don’t know what jobs will be there in twenty years. Today, apart from a few core skills we cannot know what knowledge or skills will be needed in the future.

The consequences are that teachers complain that their jobs, while rewarding, are getting harder because of too few resources, too much paperwork, crowded classrooms, students with emotional problems, low pay and high-stakes standardized tests.

Isn’t time to realign administrators, unions, teachers, parents and students? The realignment is from teaching a curriculum more efficiently, to one of inspiring lifelong learning to thrive in a rapidly shifting economy.

Here’s the case for realignment Continue reading

The Red Tape that Refuses to Die

Listen to the Radio Show of this Blog

This month’s theme.

The difficulties of cutting the red tape in  Government.

Here’s an example. Many Calgarians voted for change last October or November because they didn’t see things changing, but how much more difficult is it to change organizations like the City of Calgary? (See  Naheed Nenshi’s “cutting the red tape” podcast that contributed to his election for Mayor of Calgary) Here’s his latest comment on his cutting red tape campaign and how long it’s taking:

“We are actually going to look at a reinvention of how we do the whole process of planning, approvals and permits, and that’s going to get underway right now,” Mayor Naheed Nenshi told reporters, after a council committee approved $150,000 for public consultations on cutting red tape, an initiative that already had a $236,000 budget.

But while staff are already working on that major overhaul, Nenshi clarified later that it will likely be a year before changes are in place. Council will be looking to the incoming planning general manager to oversee much of that internal revolution.

The red tape consultation with businesses drew 202 submissions, and the vast majority concerned the city hall division responsible for permits and business licensing.

One particularly shocking testimonial read: “Two different city inspectors were actually arguing in the parking lot as to what the rules meant or did not mean in relationship to requirements for our equipment. Seven inspectors went through our warehouse before we could receive our (occupancy) permit.”

In another case, the development permit process stifled the creative process. “We want to paint a mural on a building and the DP is going to cost more than the mural!”

The first thing leaders have to cope with is more complex politics. On top of internal politics that exist in any organization they also have the political dynamics of executives, elected representatives and their appointees. Continue reading

Meeting Today’s Leadership Challenges in a Complex World

INTERNATIONAL JOURNAL OF RESEARCH IN COMMERCE, IT & MANAGEMENT VOLUME – III, ISSUE – IV (APRIL, 2012 (ISSN 2231 – 5756)

Abstract

Today leading in a complex world is one of the hot topics being discussed across organization and conferences. Every one faces complexity both in a small or large-scale industry. This complexity is driven by uncertainty and accelerating change. For organizations to thrive in this rapid challenging business environment, leaders must learn to adapt and embrace the complexity, to see it as opportunity to achieve uncommon result. This chapter present valuable insights about KPMG study confronting complexity. It identifies factors that cause complexity. It also suggests ways through which a leader can address complexity and turn it into competitive advantage.

Authors Kelly  Nwosu and Nick Anderson

1.0 Introduction

The challenge with managing complexity and leading in a complexity world has become an excuse for some business people to keep the status quo, to abandon thinking ahead and to push strategy to one side, because they don’t believe it can be flexible and responsive enough to help them in a rapidly changing world (ED, 2011). But, most organizations that succeed in the midst of complexity are those that think differently and turn the potential challenges into a competitive advantage. They also see it as an opportunity to make their company more efficient. According to the recent study confronting complexity conducted by KPMG International, the study reveals that more than 90 percent senior executives across 22 countries say their organization’s success depends on managing today’s complex business issues. Yet, less than half executives believe the actions they are taking to manage complexity have been very effective (KPMG, 2011). On the other hand, the IBM survey on global CEO’s also show that the language for reducing complexity has change, CEO’s are now talking about how to transform complexity into an opportunity to gain competitive advantage (Balkan, 2011). In our research, we were able to identify what complexity is all about, factors that cause complexity and actions to discuss the issues of complexity. In particular, this chapter covers three parts. Part 1 focuses on managing complexity while the second part focuses on leading to the essence then part 3 focuses on leading learning.

For the full article please go to  www.ijrcm.org.in

INTERNATIONAL JOURNAL OF RESEARCH IN COMMERCE, IT & MANAGEMENT  (ISSN 2231 – 5756)

If people don’t trust you, Change will Fail?

On both sides of the Atlantic, the employment compact is fracturing along the lines of manufacturing outsourcing, poor change communication and inconsistent leadership. The bottom-line is that “doing more with less”sounds macho in closeted executive strategy sessions. The reality is that those who get the work done feel the stress of over-work and unabated insecurity is eroding trust in their leaders.

How close are we getting to the “old lie”?

Dulce et Decorum est Pro patria mori.( Translation: “It is sweet and fitting to die for one’s country.”

Wilfred Owen – Dulce et decorum est pro patria mori – it is sweet and right to die for your country. In other words, it is great to work your butt off and then a get a pink slip

North Americans grow more cynical of being asked “go the extra mile” with even fewer resources. As a result, change resistance is increasingly more complex and individualistic.

This fracturing eats away at competitiveness. The leadership challenge then is to repair, build and protect the trust people have in their leaders and other functions.

In North America, over the last ten years I have conducted expectation alignment projects in very different organizations like Royal Bank of Canada, Qwest Telecommunications and Turner Construction. In every project, leaders consistently under-estimated the gaps between:

  • What they expect of their people and what the people actually think is expected of them.
  • What they think people expect of them and their people actually expect of their leaders

In all projects, leaders had 65%+ more expectations than their people were aware.  As you read on you will see that my findings are disturbingly endorsed on both sides of the Atlantic.

Continue reading

An Approach to Solving People Problems

INTRODUCTION

People problems are very varied; they can also be complex.  There is no all-embracing theory for
understanding them and no magical formulas guaranteed to solve them.  The problem-solver, where people problems are  concerned, must be an experimenter.  There are, however, a few guidelines which, if observed, will help to  save the problem-solver from wasting time and effort on ultimately unprofitable activities.

Continue reading

Complexity, the New Normal 2: Leading to the Essence

Listen to the Radio Program – 15mins

In my last blog I introduced my new leadership series – Complexity the New Normal.

It’s time we had a debate about how we develop rewarding working relationships today. (Rewarding not just productive).  It is the competitive core – energizing people and harnessing technologies better than anyone else.

The ultimate standard for such rewarding relationships is a leader’s ability to sustain superior results over an extended period.  The debate should focus three

The Gordian Knot

questions:

  • What does it mean to lead?
  • What does it mean to follow?
  • When do you choose one from another?

Why is this debate needed for us to climb out of this recession?

People have lost trust. Many business leaders, too many unfortunately,  are seen as self-serving and subservient to shareholders.

What happened? “Org Chart Thinking” increasingly doesn’t work. Knowledge workers respond to learning not “command & control”. Plus, young people don’t want to wait in line to lead. Most important, people are searching for genuine satisfaction and meaning. For example, “restoring people to full life and health.” Medtronic.

Continue reading

Complexity, the New Normal! 1: Aligning Leaders for a Complex World

Every one faces complexity driven by uncertainty and accelerating change. It is the “New Normal” making leadership more demanding and in demand.

Listen to the Radio Show

Leadership on its Head

Accelerating Complexity places extreme demands on leaders. The leader’s ability to relate, energize, and develop their followers is critical to empower them to act without direction. It’s a competitive imperative and requires a new balance of more effective and affective leadership. It’s the ability to produce results by being affective. That ability to influence people, in the way they think, feel and act is now paramount

As Peter Senge said Leaders “…cannot afford to choose between reason and intuition, or head and heart, any more than they would choose to walk on one leg…”

So, this month I deal with what leaders need to do – the easier bit. Next month, I cover the tougher piece on how leaders need to lead transformationally.

Continue reading

Getting People on the Same Page – Preparing for Change

Listen to the Radio Show based on this Blog

In this blog I want to focus on Preparing People For Change by over viewing improving people productivity and it’s connection to gaining people’s commitment.

Why is this so important as we climb out of this recession?

It’s a good question…over the last 15 years the odds of making a successful change in North America haven’t changed appreciably. Two thirds of change initiatives fail, including family businesses trying to pass on their company to the next generation. Number 1 reason executives surveyed saidPeople”

What is your take on the reasons for such a high failure rate?

The performance challenge is greater than ever. How you rebuild and lead an organization to perform near its potential is even more difficult today.

As Tim Kite of Focus3 Consulting says:

It’s challenging because an organization is the sum of its parts piecemeal improvement doesn’t address the organization’s system. To meet this challenge you need to be really clear on the difference between performance drivers vs. performance indicators. Too many people focus on the numbers and too little on Drivers:

20 Communication Channels to Get Aligned

•         Key Drivers produce performance

•         Key Indicators only measure performance (even well designed ones)

•         You can’t manage indicators only drivers can be managed
There are Five Drivers that cover your business system

•         People – Selection, Development & Retention

•         Culture – Clarity, Consistency & Connection

•         Strategy – Value Proposition, Marketing, Sales Customer Care, Financial Goals

•         Processes – Work Flow

•         Structure – Organizational Design, Role, Relationships

When you align these Five Drivers you need to ensure that:

  • Culture aligns and motivates people,
  • Strategy delivers in line with Customers needs,
  • Systems delivers high quality consistently,
  • Structure empowers people and smoothes workflow
  • People Driver recruits, develops and retains the right people.

How do you assess if these drivers are broken or needs repair broken?

Let’s take costs. To manage costs effectively across the Five Drivers you need clarity as to what are Core and Non-Core expenses or to put it another way what directly contributes to Top Line revenue vs. the cost of doing business which only indirectly contributes to revenue

Core Expenses are what drives Top Line Sales Revenue

So, Core and Non-Core Expenses first. You are likely to find functions which are internally misaligned present opportunities for improved productivity. Coupled with this is looking at inefficiencies when functions work collaborate with each other

Consider a company with nine functions, such as Production, Marketing, Finance. How many communications channels? You have 9  functions with 9 communication channels less 9 channels within each Function = 72 Communication Channels

Additionally, within one function say you had 50 people 2450 channels potentially.

As you look at these channels you find inefficiencies. Friction between Finance and Marketing is not unusual. So, what happens to communication flows? Communication reduces and fall back on being formal and response times get slower. We call these Expectation Gaps

Expectations Gaps Are like Pot Holes. Fill them quickly before damage occurs

 

It sounds like they don’t know “who’s on first” and even if they did no one is holding people accountable good starting point?

Exactly. It’s like many poor performing teams at least one of the following will apply:

•      Four Team members called Everybody, Somebody, Anybody, and Nobody.

•      There was an important job to be done.

•      Everybody was sure that Somebody would do it.

•      Anybody could have done it, but Nobody did it.

•      Somebody got angry about that because it was Everybody’s job.

•      Everybody thought Anybody could do it, but Nobody realized that Everybody wouldn’t do it.

•      It ended up that Everybody blamed Somebody when Nobody did what Anybody could have done.

How expensive is that?

What signs should look for to see if think is going on?

“That’s not what I meant…”

“This is not what I asked for!”

“My colleagues don’t seem to do what I expect…”

“They never tell us the whole story!”

“I can never do anything right!”

“They never send us information; we’re always sending information to them!”

Sound Familiar?

Yes, I know several organizations where those examples would get a lot of nodding. Do you have any idea what misalignment costs?

60%+ of change initiatives fail in North America

70%+ of leaders expectations are
not understood by their people about a major change

In the last 12 years, 2 in 3 failure rate has not changed Harvard (1996) to McKinsey (2009)

Executives surveyed continue to say the number one reason for such failures is PEOPLE. It really goes into the millions and can close businesses. In one survey 134 public companies average cost of failed IT projects was $12.5m. This does not account for the cost to their cultures and people.

What are the human costs of misalignment?

With misalignment the first to go is Trust coupled to a Fear Of Conflict. When these two exist, a Lack of Commitment grows and its partner Avoiding Accountability rears its ugly head. Finally, silos are reinforced, people do what they have always what they have always done and improved performance doesn’t happen. As these dysfunctions grow over time you will find that the 8OOlb Gorilla feeding on what’s left of your enabling culture.

800lb Gorilla of Mislignmenton a rich culture of unstated expectations and assumptions.

How many of these are due to people not being on the same page?

In our projects 70%+ of leaders’ expectations of each other and those implementing a change have not expressed. Apart from unstated expectations, how do you identify poor expectations

The biggest culprits are the expectations are ambiguous, lack specificity which leads to disappointment, failure and bad feelings etc. here’s some typical language that predicts performance improvement failure:

•  “Soon…….”

•      ASAP

•      “Right Away….”

•      “I’ll Try To Get To It………”

•      “Later….”

•      “By The End Of Next Week

So, Practically what can people do about this when they hear language like this?

First get key players get them to articulates and record expectations then apply:

“The three most important rules in creating accountability cultures are:

Specificity, Specificity, Specificity

Dealing with Expectations Gaps

1. Which expectations gaps are barriers to improving performance and reducing expenses?

2. Who do you need to gain agreement from?

3. Once agreed, ask them to tell you what evidence you will see that your expectation has been met?

4. Then, hold them accountable – “Inspect what you expect”

5. Then, what do you think others expect of you that is connected to these gaps?

6. Now, repeat steps 2,3 & 4

Have you done any projects locally where you have helped fill such expectation gaps?

 

Ken Genzink, Genzink Steel tried twice over the last five years to reduce his operational management of the Family Steel Fabrication business. On both occasions he had to reengage to save the business.

As says in his testimonial, I realize now more than ever that many decisions and observations were assumptions”

This resulted in problems like:

•      Job Shop Scheduling software didn’t work

•      People were cynical about it ever being useful.

•      Structural Steel side of the business was losing money due to poor estimating

•      Difficulty in retaining skilled people

The Implementation consisted of the following activities:

•      Developing a vision for change to reduce dependency on the

•      Owner’s day-to-day management.

•      Isolate key Alignment Components and their definitions which Ken Genzink saw as crucial to achieving greater market responsiveness and help him devote time to his other businesses

•      AlEx™ was then configured specifically for Genzink Steel. AlEx™ is an Automated Accountability Tracking tool that identifies expectations gaps and monitors people’s progress in filling them.

Ken now works at another location devoting the time he needs to the other Family businesses. Gross Revenues have steadily increased from $20 to $30m, and

Genzink is now on the acquisition trail.

“104 jobs: Genzink Steel Supply and Welding Co., maker of metal wind turbines, and other fabrications”(GR Press Aug 2008)

Tip of the Month

If you are getting people ready for change

My Expectations of Others

•      What I expect you to keep doing

•      What I want you to start doing

•      What I want you to stop doing

Others’ Expectations of Me

•      What things I think others want me to keep to keep doing . . . .

•      What new things I think others want me to start doing . . . .

•      What things I think others want me to stop doing . . . .

Then meet with those who you need  to implement your change and compare your answers – be prepared for surprises.

Listen to the Radio Show



Great, but how can this help me?

This is probably the  first thing on your mind after reading this Blog.   How about asking us?  The first call is free!  Just email me to set it up.  Don’t wait, get TCA working for you!. If our conversation leaves you needing more, we offer at a reasonable fee telephone and video coaching improve bottom line results.
If that still doesn’t do it, we’ll work with you on a solution.

_________________________________________________

____________________________________________________________________________
For Help in Getting Your People on the Same Page
Nick Anderson, Senior Partner, PDS Group LTD
E-mail I Web I Linkedin

© Copyright All Rights Reserved, TCA and Walk the Talk – A Blog for Agile Minds, [2010-2011]. Unauthorized use and/or duplication of this material without express and written permission from this blog’s author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to Nick Anderson, PDS Group LTD and Walk the Talk – A Blog for Agile Minds with appropriate and specific direction to the original content.

Ensuring Oilsands Project Success – Whitepaper

Authors: Brant Sangster, IMC (former Sr. VP Oilsands Petro Canada),Dr. Paul Clark, IMC (former CEO Nova Chemicals Technology, Board Member NRC, CCEMC),Dr. George Jergeas, Dept of Civil Engineering, University of Calgary, Nick Anderson, Senior Partner, PDS Group, Editor: Rolf Wenzel, IMC, Director Business Planning

Overview

Mobilizing armies of skilled labour from diverse locations and cultures, moving large equipment into remote locations in harsh climatic conditions and managing to budgets while costs are escalating make oilsands projects among the most challenging ever undertaken. Perhaps the most critical success factor  in managing such complex projects is establishing and developing productive relationships. This key factor is very difficult to measure yet is cited repeatedly as the number one reason for project failure. Consistently,  project  managers’  expectations  of,  colleagues,  teams,  subcontractors,  workers  and project  partners  are  substantially  different  from  what  they  actually  think  is  expected  of  them.    Such misalignments result in expected tasks not being completed in the way required for project success, tasks  being  completed  in  a  sub-optimal  sequence  or  excessive  time  invested  on  “low  return”  tasks. These  misalignments  cascade  into  scheduling  conflicts,  delays,  cost  overruns,  personnel  turnover, increased stress, safety and legal issues.
The take-away: New methods have been developed for the gathering and analysing of expectations from both the expectation originator’s and expectation receiver’s point of view. This enables the diagnosis of misalignments critical to project success, and facilitates the timely conversations required to align expectations and to keep projects on track before they become critical variables. Resource and competency gaps are exposed  and addressed. High achieving managers can be identified. A culture of communication, alignment and accountability can be measured and developed.

Listen to an introduction by Nick Anderson

CONTENTS

1.0 Oilsands Projects – What Makes Them Unique
2.0 Why do Projects “Fail”?
3.0 Expectation Alignment for More Effective Project Planning and Execution
4.0  Case Study – Large Construction Project
5.0 Project Teams as a Neural Network – The Foundation for a Culture of Alignment and Accountability
6.0 The ROI for Oilsands Projects

1.0 Oilsands Projects – What Makes Them Unique

The Opportunity

With over 170 billion barrels of recoverable reserves, the Alberta oilsands represent a unique opportunity for North America to achieve a greater degree of energy independence in a low risk operating  regime.    Total  oil  supply  from  Western  Canada  is  expected  to  grow  from 2.4 million barrels  per day  in 2005  to  over  3.6  million barrels  per day  (bbl/day)  in 2015,  an increase of 50%.  This requires an investment of between $94 and $125 billion.1 While  some  bitumen  reserves  are  accessible  using surface mining  techniques,  most of the recoverable reserves  are  deeper  and  accessed  using  Steam Assisted  Gravity  Drainage  (SAGD)  technology  that requires far less surface land disturbance. While not without  reservoir  risks,  SAGD  enables  operators  to expand  production  more  gradually  than  mining operations because the minimum economic size of a SAGD  project  can  be  scaled  down,  perhaps  even below 10,000 bbl/day.

 

Suncor Oilsands Plant

The Challenges
Size – These large projects are large, with capital budgets currently ranging from $250 million to $7  billion,  or  US$25,000  to  US$70,000  per  flowing  barrel.    Projects facilities range  in  size from10,000  bbl/day  to  over  100,000  bbl/day.      Every day  of  schedule  slippage  could  cost between $1 million and $10 million in lost revenue. Complexity  –  These  projects  are  characterized by  a  large diversity  of functional  areas  each with  separate  project  managers, budgets  and  schedules.    There  are  many  project  elements, requiring  a  long  build  schedule  with  the  possibility  of  multiple  EPCs  and  many  and  diverse suppliers and contractors.
For example: Designing and constructing a $3-billion oilsands project can involve the following:
(Why Cost and Schedule Overruns on Mega Oil Sands Projects?, George F. Jergeas, Ph.D., P.E.1; and Janaka
Ruwanpura, Ph.D., PQS2; Practice Periodical on Structural Design and Construction, ASCE / February 2010)

Engineering effort:

  • 3.5 million work hours at a cost of $100/h.
  • 40–50,000 design drawings.
  • 10–20,000 vendor and shop drawings.

Construction effort:

  • Typically runs at 5,000 work hours for each million dollars invested, i.e., 10–15 million man-hours at $85–$100 per hour for a $3 billion project..
  • Supported by 500–800 staff personnel.
  • Labor force of 10,000 workers with a turnover of 30,000 people. (Even using the lowest North American average estimates of replacement costs for $8.00/hr employees of $3,500, this equals a cost of $105 million!)
  • Organize order, store, and retrieve 80,000,000 material items.
Procurement and transport logistics challenges to a remote location can be  exacerbated by long lead  times  on  key  equipment,  increasing  the  risk  of  scheduling  conflicts  and  slippage. Personnel training, scheduling and logistics are complex and include continuous flights bringing workers in from Eastern Canada and elsewhere.   There are complicated communications lines among the functional areas, contractors, locals business and governments.  The  involvement  of  multiple  equity  partners  with  substantial  financial  interests  adds  another level of accountability and can be a bottleneck in decision making.  Partner communications can add significant project overhead and makes it more difficult to respond to change, or innovations arising mid-project that could benefit the project.
Climate – Harsh climatic conditions affect productivity, health and safety, and project costs, especially for workers unused to working in these conditions. Health & Safety – In addition to working in a harsh climatic environment, cultural and language barriers with foreign workers can affect safety.  High turnover and inexperienced workers pose dditional safety risks.
Labour – Availability and Productivity – As projects begin to ramp up again, the risk of shortages of experienced project managers and skilled labour may again increase.  Personnel retention was a major issue during the construction boom up to 2008.  The cost effective integration of aboriginal  contractors  requires  special  attention.    The  balance  between  union  and  non-union labour must be planned and managed.   Housing and the cost of living are expensive in the Ft. McMurray area. Workforce scheduling and logistics are a major challenge and there has been  lack of  cooperation among operators  in this area,  largely based on concerns around  losing personnel to other projects.
Environmental – Oilsands projects have become the centre of media attention in the past few years.  Thus, even the design and construction phases of these projects must demonstrate a proactive stance, rather than just compliance.
“In summary, future oil sands projects are going to be more complex due to both a set of external and internal factors interacting dynamically with each  other.  This  means  that  the  industry’s  ability  to  manage  socio-political, economic and technological fluctuations over a project’s life will be  critical.  This  is  not  an  advocacy  for  throwing  out  the  tried  and  true project management disciplines but learning how to use them in far more fluid circumstances”
(Richard Westney, Westney Consulting Group)

2.0 Why do Projects “Fail”?

“Insanity: doing the same thing over and over again and expecting different results”
Albert Einstein

The State of Oilsands Projects

During the 2005 to 2008 period, oilsands  projects were notoriously over budget and behind  schedule.   With  the  current  ramp  up  of  projects,  can  we  face  similar  cost escalations and labour shortages  in the coming years?
Randy Ollenberger, (BMO Nesbitt Burns Inc.), points to the expansion of  the Athabasca Oil Sands Project as it was the biggest project to continue construction throughout the entire market crash. But  rather  than  costs falling, they  continued to  rise.  If  there were great  savings to be had, they should have captured them. And clearly they haven’t,” he said.
Steve Laut, President, Canadian Natural Resources (05/21/10) fears that cost escalations may be an unavoidable outcome of the rush to get back into oil sands.
“There will probably come a point in time that people feel confident oil prices aren’t  going  to  fall  to  $30  [U.S.]  again  and  everyone  will  have  their engineering done more or less at the same time. So there’s potential that you could get some overlap in projects. Canadian Natural is already struggling with the lingering effects of the last boom, when triple-digit oil prices propelled a mad building scramble. That has resulted in operational problems at the first phase of its Horizon oil sands project, which Mr. Laut admitted has been “bumpy.”
A recent Booz Allen Hamilton report, “Capital Project Execution in the Oil & Gas Industry”, indicated that the majority of energy industry executives:
  • Are dissatisfied with project performance (40% of capital projects overrun) his level of dissatisfaction is the highest ever.
  • Agree  that  poor  project  performance  is  not  acceptable  when  the  market  expects predictability and strong returns.
  • Accept that they cannot afford to miscalculate project risks, yet they do not have a good grasp as to how to manage them.
According to Richard Westney, Westney Consulting Group,
“Everyone in the industry is aware of the major cost overruns and schedule  delays  associated  with  major  projects  today.  An  often overlooked  fact  is  that  these  overruns  are  often  announced  when projects  are  well  into  construction—long  past  sanction  and  at  a  time when traditional project risks have (or should have) been mitigated. How is this possible when conventional wisdom suggests that all project risks should  have  been  understood  and  under  control  by  this  time? Conventional project risk management is based on two assumptions:
• Good “front-end loading” ensures a high level of confidence in the estimate of time and cost at sanction.
• Project risks decrease with time and progress.”
Since it is not uncommon for projects with good front-end loading to experience major  overruns  well  after  sanction,  we  must  ask,  “What  is  missing  from  the conventional approach?”

Symptoms and Causes

The symptoms of “project failures” or significant negative variance from plan are obviously manifested  in  easily  measurable  parameters  such  as  budget  overruns,  lateness  and  safety issues. However, problems can start long before these measurements of tactical activity are possible. Jergeas  et  al5  point  out  that  the  trend  towards  project fast  tracking  can  result  in  appropriate planning time being traded for overly ambitious construction schedules which can result in more overtime  and  higher  materials  and  equipment  expenses.  In  addition,  inadequate  time  spent planning  in  areas  of  risk  management,  project  control,  communications,  organization, contracting, design, procurement, site layouts, utilities, commissioning and external stakeholder  management, among others, can result in a fundamentally misaligned project strategy. Conversation  with  oilsands  operators  and  a  review  of  the  2004  multi-sector  study  by PricewaterhouseCoopers  (PWC),  “Boosting  Business  Performance  through  Programme  and Why Cost and Schedule Overruns on Mega Oil Sands Projects?, George F. Jergeas, Ph.D., P.E.1; and Janaka Ruwanpura, Ph.D., PQS2; Practice Periodical on Structural Design and Construction, ASCE / February 2010
Project Management”,  among  the  top  reasons  cited  for  “project  failures”  were  issues  and misalignments in the following areas:
  • Late scope changes

    Nearly but Not Quite

  • Change in environment
  • Insufficient resources / Poor support
  • Poor communications
  • Poor project processes and controls
  • Poorly developed teams
  • Poor partnering strategies
  • Poor contracting strategies
  • Team turnover
  • Inadequate definition of stakeholders
Late Scope Changes – To what extent are scope changes the result of inadequate communication of  expectations  between  owner  and  EPC,  or  EPC  and  contractors?    At  the earliest stages of the project, inadequate specifications can be a root cause.  The owner may expect the EPC to have conducted a thorough review of specifications prior to start of drafting. Was this expectation communicated and detailed evidence of completion requested?   The later in the project these sorts of changes occur, the more expensive they become. Attempts to appease, accommodate or just to get things done means change orders or scope changes  are  too  readily  accepted  without  sufficient  impact  analysis.  This  situation  is  often compounded by having no firm and set date beyond which no further changes are accepted.   It is  reminiscent  of  Mr.  Creosote,  a  fictional  character  in  Monty  Python’s  the  Meaning  of  Life. Creosote  is  an  impossibly  obese  man  who  is  served  an  enormous  amount  of  food  in  a restaurant. After being persuaded to eat one more mint, he explodes in a very graphic way. The key error is the consequent layering of changes creates an almost blinkered approach of approvals or rejections while losing sight of bigger, end repercussions.
Changes in EnvironmentIt may be beneficial to ask the question, “How can we improve our  ability  to respond to  environmental  and other  changes”?   To  what  extent  could  improved communication of expectations mitigate these issues?  Have the owner and EPC clearly relayed their expectations of rapid communications from contractors and suppliers when circumstances change?    Does  the  project  have  a  change  management  plan  with  specific  communication protocols for managing crises?
Insufficient Resources  /  Poor  Support –  Supply  chain  logistics  are  both  critical  yet vulnerable aspect of oilsands project execution. It relies heavily on proper communication and tracking agreed and unmet expectations.    Shift scheduling and logistics optimization offer large opportunities for efficiency gains.  To what extent are the expectations of efficient and proactive communications  relayed  to  all  levels  of  the  project  structure?    What  mechanisms  exist  to facilitate this and ensure monitoring of logistics operations? Especially  lacking  are  those  inter-professional  expectations  which  don’t  really  specify  what  is being  agreed  to.  The  act  of  agreeing on  an  expectation  is  too  easily  accepted.  The problem emerges when the expectation’s Receiver doesn’t deliver what was expected by its Originator. The problems often lies when the Originator doesn’t ask the Receiver to state what evidence they think meets the given expectation. This  situation  is  often  compounded  under  stressful  and  changing  conditions  where  the ramifications of meeting the new expectation are not fully considered on existing commitments.
Poor Communications – The number of possible lines of communication in a project can be expressed as n2 – n, where “n” is the number of people assigned to the project.  Thus a 100 person project would have 9,900 possible communication links.   Regardless of matrix, project or siloed command structures, there are still many cross functional and contractor expectations that are not surfaced or managed and that impact project execution. These lateral links are so numerous and not so obvious that important connections for timely and  accurate  communications  are  missed.  Many  would  say  with  all  the  technology  now available, all those involved have access to what everyone else is doing or challenged by. The reality, as one Project Manager expected of a design engineer: “If you find out you can’t make your deadline, don’t email me – pick up the @#$% phone…” Communications technology has become a two- edged sword – efficient yet overwhelming. While  many  respondents  cited  poor  communication  a  significant  problem,  to  what  extent  are poor communications or processes a root cause of the other cited project failures?  Following are quotations gathered from participants in various projects:
1. “We could be better at identifying problems and their solutions before they actually occur.  We are too reactive and this slows us down”
2. “The way we allocate resources and feedback on their (subcontractors’) performance compounds problems in managing projects”
3. “People get so absorbed in what they are doing that Key Stakeholders are not actively involved. This has led to tension between them and the project team”
4. “We are reactive and respond too quickly to changes to understand the implications and impacts on other elements and groups”
5. “We don’t reuse what has been done before – “Reinventing the Wheel” is costly and takes time”
6. “Measuring the impact of what we do is too subjective and lessens our ability to stay within  budget”
7. ‘Cost overruns and missed milestones are too common and compounded by finger pointing”.
Some of which are directly attributable to expectation gaps:

Project Team Dysfunctions

Dysfunction #1: Absence of Trust
This occurs when team members are unsure what others really expect of them as opposed to what their company has committed to legally.
Dysfunction #2: Fear of Conflict
Teams that lacking trust are incapable of engaging in unfiltered, passionate debate about  key  issues.  This  causes  situations  where  team  conflict  can  easily  turn  into personal, veiled discussions and a retreat to pure self interest.
Dysfunction #3: Lack of Commitment
Without conflict, it is difficult for team members to commit to decisions, creating an environment  where  ambiguity  is  comfortable.  Lack  of  direction  and  commitment  can make project partners and teams disgruntled, fall into formal communication and lack of responsiveness.
Dysfunction #4: Avoidance of Accountability
When teams don’t commit to a clear plan of action, even the most focused and driven individuals  hesitate  to  call  their  peers  on  actions  and  behaviors  that  may  seem counterproductive early enough to correct a situation for the overall good of the project.
Dysfunction #5: Inattention to Results
Project team members naturally tend to put their own needs (ego, career development, recognition, etc.) ahead of the collective goals of the team when individuals aren’t held accountable. If a team has lost sight of the need for achievement, the project ultimately suffers.
The above dysfunctions are rooted in problems with aligning expectations.
(Adapted from Patrick Lencioni “Five Dysfunctions of a Team”)
“Expectation Gaps are like pot holes, the more you leave them the deeper they get. The impact of misalignment leads to projects overruns.” (Nick Anderson, PDS Group LTD)
Poor Project Process and Controls Execution – It is the daily execution using project process  controls  that  makes  the  difference.  Senior  management  can  be forgiven  for  thinking that if processes and controls are in place that they are being used diligently.   However, the early  clear  communication  of  specific  expectations  around  development  and  use  of  these systems is foundational to success. Increased complexity and changing dynamics in running oilsands projects means the industry has to pay more attention to the costs of misalignment.
Poorly Developed Teams – While projects of this size and complexity usually command the best available personnel, Alberta companies often have large experience gaps between senior managers and junior managers.   Bridging these competency gaps requires clear expectations communication  of  responsibility  not  just  tasks.    Then,  crucially,  conversations  must  align expectation originators with the expectation receivers, including deliverables. Only then can the originator effectively rate the receiver’s competence and performance.
Poor Partnering Strategies – Staffing for inter-partner communications, that add millions of dollars to the cost of a project, buffer the project teams from regular and ad hoc reporting and information requests.  The less work that is done up front in explicitly defining expectations in geographically remote and culturally different partners, the more cost in communications.  Far more  important  however  are  the  potential  for  delays  in  the  project  where  unexpected circumstances  need decisions  requiring  consent  from  partners.        These  may be  changes  in project  circumstances  or  opportunities  for  applying  improvements  or  innovation  with  potential positive economic impact on the project.
Poor Contracting Strategies – Failure to document performance guarantees and risk sharing  obviously  undermines  contractual  relationships.  However,  on  site,  it  is  really  about avoiding ever to having to use them.   As many say, “if you have to get the contract out then we really are in trouble!”. Partnering starts to fail when specific expectations aren’t communicated, agreed,  discarded  or  are  unresolved  to  avoid  using  these  contractual  devices.      Successful partnering is founded on: ”Getting personal to  prevent ever getting contractual”.
Team Turnover – Poor communication and alignment of expectations often causes of turnover.    When  expectations  like  budgetary  discretion,  scheduling  flexibility  and  safety protocols are not only agreed but managed to, employees may not wish to stay and face the consequences. This will be a major factor again if the industry goes back to its practices of the last boom in Alberta. Apart from cost and experience and project knowledge “walking out the door” from the project managers risk losing well  established relationships  both  within  and  outside the  team.  They  then  hobble their replacements with no clear commented expectations to help new team members get up to peed with the right people.
Inadequate Stakeholder Engagement – Oilsands project stakeholders are diverse, typically  including  owners,  EPCs,  contractors,  suppliers,  logistics  providers,  regulators,  local communities, local businesses, aboriginal communities, environmental groups and others. It’s  natural for those  planning projects  to focus on  project execution.  Yet  how  often  has  their apparent disregard of some stakeholders led to delays, scope creep and cost overruns?  Here the illusion of efficiency fails to take into account those that need to be onside for the project’s success.    This  then  creates  a  corrosive  element  to  relationships  when  stakeholders  feel disregarded.  By  the  time  Project  Staff  realize  the  need  to  align  they  have  an  uphill  battle  to convince these parties of there inadvertent lack of alignment. The key concern is: How many of these stakeholders and project staff will then be involved on subsequent projects. Mutual suspicion built up from one project bleeds over to the next project.
Summary
In summary, planning, whether “fast track” or not, still requires a clear concise and communication  of  expectations  by  stakeholders  along  key  aspects  of  the  project strategy.   While  this  paves  the way  for  successful  project execution,  simply  allocating the resulting tasks does not ensure success. Without project   manager’s expectations being  understood  and  “bought  in  to”  by  the  engineering  or  construction  domains, improved performance will not occur.   Fast Tracking methods of strategic planning and construction  risks  getting  ahead  of  stakeholder’s  ability  to  measure,  manage  and facilitate communication. New methods of more effective communication and alignment of  critical  expectations  are  needed  to  cope  with  this  decade’s  accelerating  project dynamics.

3.0 Expectation  Alignment  for  More  Effective  Project Planning and Execution

You Can Only Manage What You Can Measure

Effective interpersonal communications is  a  recognized  cornerstone  of successful  project  management.    Why then  is  it  so  metric  and  data  starved? How  can  we  manage  what  we  cannot measure?
Many people who run projects will tell you:
“Building the thing is not difficult compared  to  managing  all  the  people involved”
So,
  • How do we develop measurable ways of working more effectively?
  • How do we assess people’s expectations  of  others  with  those  others have of them
  • How can we help people be more aligned and focused
  • How can we drive performance discussions  between  groups  and individuals  on  their  expectations  and assumptions that result in:
o Specifying clearer performance criteria against which individuals/groups will be measured
o Removing expectations that are non-value added and not strategically aligned
o Identifying significant issues to address for project advancement
o Creating an accountability framework

The AlEx™ Expectation Alignment Methodology

The AlEx™  Expectation  Alignment  methodology  is  a  key  driver  of  change  which  accelerates alignment  and  tracks  the  development  of  working  relationships.  Such  tracking  includes:
  • Distractions that impact work loads
  • Misaligned expectations which reduce flexibility, risk rework and cost overruns

    Human glue

  • Factors that reduce cross functional competitiveness
  • Misalignment with organizational principles and strategies
  • Productivity issues between managers and their staff
  • Quality of interpersonal communication
  • Integration of new team member
  • Performance tracking & management
  • Recruitment & talent management
The impact of this approach is:
  • Insurance against projects delays
  • Faster project execution
  • Better productivity
  • Improved employee retention
  • Attracting people who are naturally better aligned
Essentially these benefits accrue when all people understand:
  • What is expected of them
  • What they can expect from others
  • How well they are strategically aligned
  • How their performance is measured and compensated
  • What they can stop doing
  • What they need to focus on
  • What information and resources can be used to achieve their goals
  • How they are going to be supported and coached

How AlEx™ Works

Using the AlEx  Easy Entry™ web application, individuals  identify  their  expectations  of  others and what they think is expected of them. AlEx™  is  then  used  to  analyze  content,  quantity,  and quality of the Expectations generated. AlEx™ Cross-Hairs Alignment Tool™ provides targeted data pictures of groups and one-on-one relationships as shown on the right.
For  example,  the  relationship  between  Tom and Cliff  looks  aligned  if  you  only  look  at  Tom’s expectations of Cliff (13) and what Cliff thinks Tom expects him (12). But, Cliff’s expectations (22) & What Tom thinks Cliff expects of him (4) tells a different story. Users are then shown how to use their AlEx™ Cross-Hairs Alignment Tool™ to “rifle-in” on data  to  prioritize  which  alignment  meetings  are  really  needed.  Then  users  meet  and  decide which of their expectations are:
  • Discards
  • Unresolved
  • Agreed
This ability to “rifle-in” on key issues before they cause entrenched discord is much like “clash identification” in BIM (Building Information Modeling).
AlEx™ is the “human cousin to BIM”
Dick Ortega, President, Alternative Mechanical
Building Information Modeling (BIM) is the process of generating and managing building data during its life cycle[1]. Typically it uses three-dimensional, real-time, dynamic building modeling software to increase productivity in building design and construction.[2] The process produces the Building Information Model (also abbreviated BIM), which encompasses building geometry, spatial relationships, geographic information, and quantities and properties of building components.

AlEx™ Outputs

1. Distraction Index
The Distraction Index identifies which individuals  or groups are aligned or distracted from achieving strategic goals:

Closing the Distraction Gap

  • Aligned,  and  Doing  Things  that  are  Expected —  expectations  and  assumptions  of  these expectations are in balance.
  • Distracted,  and  Doing  Things  that  are  Not  Expected —  individuals  are  making  incorrect
  • assumptions about what others expect of them
  • Distracted and Expecting Things that are Not Done — expectations exceed assumptions of those expectations.
 

Designers & Owners Tension Ratings

2. Tension Ratings

Expectation originators rate each of their expectations on a scale from High (project critical) to
Low Tension if an expectation is not met. Tension rating filtering enables users to see how well they are aligned
in terms of stress and the importance others place on different areas of the construction process.
3. Cross-Hairs Communication Channel Analysis
Un-Channeled
In a construction project, groups are often expected to change who they communicate with and about  what.  If  for  example,  the  General  Contractor’s  Project  Executive  is  expected  to  work closely  with  the  Chief  Superintendent  to  adopt  Lean  Construction  practices  to  meet  Owner expectations and they d 

Misaligned Core Group

o not have any expectations of each other! Conversely, if the Design Engineers  now report directly  to  the newly appointed Owner’s  Engineer and  not  the  Owner’s Facilities Manager then you would not want to see people still having expectations of the GM.

4. Cross-Channeled
Medium levels of expectations are often needed between different professions and trades as the main construction phase begins. This is especially true in Design-Build Projects
Highly-Channeled
High levels of expectations are needed where people work in the same function or project, e.g. Owners and EPCs.
5. Dealing with Change
Changing project circumstances require timely responses. AlEx™ is a real time system that enables adaption of existing or creation of new expectations to handle change.  E-mail updates of  such  changes  can be automatically  broadcasted.   AlEx™  has  adjustable granularity,  i.e.  it can  deal  with  high  level  expectation  alignment  through  to  execution  level  task  alignment, depending on the changed circumstance.
6. How Does AlEx™ Integrate with MS Project™ and Other Project Management Systems?
AlEx™ acts as a project management “front end” to keep existing project reporting systems updated with not only task completion status, but also with changed expectations required by changing internal or external circumstances.   Thus expectation alignment can be maintained without having to change pre-existing reporting systems. The interface between AlEx™ and existing systems is done via scheduled batch file updates. Thus  even  if  the  project  “playing  field”  changes,  the  benefits  of  aligning  team  members  are realized  continuously  throughout  the  life  of  a  longer  project  using  existing  reporting  systems. Adding  AlEx™  can  make  existing  project  management  systems  more  than  just  dashboards, they can become navigation systems, to keep the project on course as circumstances change.

4.0 Case Study – Building Construction Project (See Case Study)

Symptoms
This large construction firm manages and constructs large projects around the world. Some of their most complex work is on hospital projects. In  this  case,  the  number  of  change
orders, RFI’s (Requests for Information) and building decisions awaiting government  regulatory  agency  approval had  pushed  a  $500  million  hospital project into crisis.
The owners and prime contractors were faced with escalating change orders brought on by a number of factors including drawing quality, owner groups changing their specifications and a series of contractual changes. Consequently, the overall contingency fund for a three hospital project was being depleted at an accelerated rate.
Relations between owners, engineering firms, architectural design professionals, subcontractors and the general contractor had become strained.
The leadership group representing the major players became increasingly concerned about the ineffectiveness of OAC meetings (Owner/Architect/Contractor), and the cost of having so many rofessionals/consultants on hand, all charging professional level hourly rates.
Diagnosis and Therapy
The AlEx™ Expectation Alignment methodology was employed with the following approach:
  • Facilitation of meetings with each of the main group’s leaders to elicit their perspective on the key issues and what they wanted to be better aligned on with other groups/individuals.
  • Development of consensus of six key issues or “components” on which all 7 groups (a total of 35 people from 17 companies) agreed would require alignment
  • Coaching of all these players in generating expectations for each of these components (within and between groups)
  • Providing analysis and feedback to the leadership team, isolating several key initiatives.
For example:
  • Aligning OAC representatives to focus on key initiatives in each of the three projects
  • Setting up structured coaching within owner, general contractor and architectural firms
  • Aligning the change order process across the three projects
  • Accelerating the decision to replace the incumbent architects and help integrate their replacement
  • Aligning three architectural firms on fostering better co-ordination and common design policies
Outcome
The leadership group recognized the following tangible benefits from applying the AlEx™  system:
  • Cost hemorrhaging was stopped.
  • The project was completed on schedule.
  • There was no post project litigation among the 17 organizations involved in project planning and execution.
Other intangible benefits noted by the client:
  • Created a more productive environment for all of our building Partners Reduced or eliminated conflicts of all kinds by improving the way we communicate with each other
  • Reduced schedule blocks and re-work, thereby maintaining the approved construction  schedule
  • L ed the way for our partners (Client, Design Team, Inspection Agencies, and Subcontractors) in conducting business in a fair, open, and trusting way as the means to eliminate profit erosion, conflicts, and claims
  • Utilized “Partnering” as the means to accomplish our initiatives In a “design-build” environment which included a government owner, we were able to resolve several major conflicts using AlEx™ to expose hidden and unspoken expectations in “real time.
  • Ongoing communications became much more interactive and without conflict.
  • Tools from our partnering sessions are long lasting were used by all parties almost daily to insure the success of each stake holder. A reduction in lost time and resources resolving “festered” conflicts, because most were resolved before they reached such a state.”

5.0 Project Teams as a Neural Network – The Foundation for a Culture of Alignment and Accountability The Project “Brain”

Consider each team member a neuron in a “Project Brain” and the lines of expectations with other team members as synaptic connections. A one  way  expectation  will  be  a  weak  synaptic connection

Project Synapses are essential to neuronal function: neurons are cells that are specialized to pass signals to individual target cells, and synapses are the means by which they do so.

until it is acknowledged and accepted by another neuron.The AlEx™ expectation alignment process facilitates  and  measures  the  creation  of aligned expectations  so  the  Project  Brain  grows  and learns to better able to handle change. Thus,  like  brain  plasticity  now  being  discovered  in  humans,  the  Project  Brain  will  adapt  to changing circumstances by discarding synaptic connections (fulfilled or dropped expectations) or making new connections (new or altered expectations).The Project Brain is effectively self-diagnosing, exposing the squandering of energy (on unnecessary tasks) or resource deficiencies (lack of materials, knowledge or support).  It can also regulate the release of hormones to stimulate action (tension ratings).

Tools Facilitating a New Project Execution Culture

We have seen how one of the most important aspects of project management, expectation alignment, can now be measured and managed.  However, a toolkit and system to enable this does  more  than  measure  and  manage,  it  promotes  a  culture  of  communication  and accountability. Aculture of accountability is fostered  by AlEx™ because it ensures team members gain a feeling of control over what is expected of them but also that their expectations of others are understood  and  evidence  of  task  completion  documented.      As  the  entire  AlEx™  process requires more effective communications, team members must incorporate it in their regular work activity.
Competency Development

Like any habit, coaching and repetition are key factors in adoption. Initially, facilitated expectation  alignment  sessions  are  combined  with  training  on  the  web  input  of  expectation parameters.    Periodic  monitoring  of  alignment  progress  then  helps  ensure  the  most  efficient adoption  of  this  methodology.      Corporate  internalization  of  the  system  is  accomplished  with relatively  simple  “train  the  trainer”  sessions  that  enable  provision  of  in-house  facilitation  and monitoring services. AlEx™ identifies  communications  weaknesses  among  managers,  where  coaching  may  be needed, thus strengthening the project team going forward.
Optimized Resource Allocation – Top Down and Bottom Up
For an improved accountability culture to take root, it must be not only top down and bottom up but  omni-directional.    It  takes  root  because  expectation  originators  are  accountable  to  the expectation  receivers  to  ensure  they  have  the  required  competencies  and  tools.  This  is  the neural connection that builds the Project Brain’s capacity because people explicitly know:
  • What leaders expect of them (typically 70% of leaders’ expectations are either not known or understood by those executing the project)8
  • What team members expect of their project leadership.

6.0 The ROI for Oilsands Projects

Sources of Payback

Adoption of any new process must have a return on investment. While Expectation Alignment has  been successfully  employed midstream  to  “projects  in  crisis”,  it’s  highest  ROI  is  realized when  used  in  real  time  to  diagnose  and  address  communications  weaknesses  and  enable proper project planning and execution. Reviewing our key sources of failure, we can now see where payback can be expected applying Expectation Alignment:
Project Planning – Early alignment of all stakeholder expectations avoids expensive surprises and delays. Alignment facilitates “faster track” planning while reducing the problems of rushing to “Get on with it”, then paying the price later in areas ranging from design, project control and procurement.
Minimized scope changes – The owners’ expectations of the EPC  to have conducted a thorough review of specifications can be conveyed in a very detailed manner using Expectation Alignment.  This can avoid delays due to RFIs and change orders on critical path items.  With delayed revenue costing millions of dollars per day, the investment in expectation alignment can payback in a single avoided change order.Expectation alignment can facilitate  efficient assessment and incorporation of innovation that may  have  a  significant  long  term  benefit  to  the  project  economics.    This  is  accomplished  by enabling faster alignment and decision making among multiple project partners.
Change in environment – Even with a change management plan in place, a methodical and efficient way to incorporate new and discard old project expectations can mitigate costs by:
  • Improving response time,
  • Discarding activities quickly
  • Refocusing project teams to the new realities
Resource and support issues- – Early definition of resource expectations all the way down the chain of command can avoid costly delays and expenditures.  Similarly, competency gaps
can be identified sooner by engaging in expectation alignment processes.
Improved communications – With numerous stakeholders involved in planning, financing, permitting, engineering, procurement, construction, commissioning and operation of an oilsands asset,  static  definitional  documents  such  a  project  charters  and  conventional  project management  tools  are  not  designed  to  manage  thousands  of  changing  expectations. successful  project  execution  rests  on  agreeing,  discarding  or  identifying  the  unresolved. Expectation alignment methods identify managers who are especially strong or weak at communicating with their teams.  Coaching or other remedial actions can thus be undertaken and the results monitored. Employing Expectation Alignment in materials supply chain and personnel scheduling / logistics stakeholders can have big paybacks in avoided scheduling problems. Improved  project  processes  and  controls  –  Expectation  Alignment’s  regular  and measurable  process  of  developing  and  agreeing  project  expectations  are  taken  to  a  level needed  for  a  given  project.    Unlike  project  reporting  which  can  often  identify  symptoms, Expectation  Alignment  tools  also  make  accountability  for  task  execution  highly  visible. Expectation Tension Ratings may also reveal important tasks that are not necessarily on the critical path but can have huge ramifications to project schedules or budgets.
  • Late scope changes
  • Change in environment
  • Insufficient resources / Poor support
  • Poor communications
  • Poor project processes and controls
  • Poorly developed teams
  • Poor partnering strategies
  • Poor contracting strategies
  • Team turnover
  • Inadequate definition of stakeholders
Stronger teams The Expectation Alignment process demands that Expectation Originators ensure  that  Expectation  Receivers  have  the  competency  and  resources to  complete  the required  tasks.      In  situations  where  senior  managers  are  working  with  junior  personnel, assumptions  are  often  made  on  their  level  of  process  knowledge  and  industry  practices. Expectation Alignment addresses these issues by facilitating the alignment conversations that reveal experience gaps early enough to develop people and avoid later termination.
Stronger partnering strategies – Early definition of equity partner expectations among all key project themes and issues can be achieved using expectation alignment.   This can reduce inter-company  communications  staffing  requirements,  but  most  importantly  accelerate partner decision making when circumstances change or opportunities arise.
Improved contracting strategies – Incorporating  subcontractors and  key suppliers  in the Expectation Alignment process often reveals owner expectations and other stakeholders are not captured  in  specifications  and  contracts,  yet  play  a  significant  part  in  them  being  effective. Diagnosing and addressing these issues avoids later conflicts and delays.
Retention of talent – Again consider the 5 key” Project Dysfunctions”. ( Absence of trust, fear of conflict, lack of commitment, avoidance of accountability and inattention to results). Getting teams  participating  in  facilitated  expectation  alignment  sessions  creates  an  objective assessment of  team  stressors  and progressively  builds  a  more robust and  productive  project team culture. Based  on  this  foundation,  Expectation  Alignment  becomes  an  effective  tool  to  getting  new people up to speed and address competency gaps before their credibility is damaged.
Better  stakeholder  engagement while  inclusion  of  all  stakeholders  is  an  obvious apparent  remedy  to  avoiding  later  project  problems,  the  explicit  definition  of  mutual expectations,  especially  of  external  stakeholders,  can  yield  big  paybacks.  For  example, proactively  establishing  a  local  community’s  expectations  before  major  decisions  are  taken builds inclusivity and provides a more objective basis with which to resolve later conflicts and political  changes.    Projects with  international  partners  can  address cultural and other barriers with explicit expectation alignment methodologies.
Summary
In summary, where delays are measured  in millions of dollars a day, improving  the  speed  and  agility  of  construction  has  been  the  “holy  grail”. This pursuit encourages putting in place more controls and systems which often  fail  to  adequately  cope  with  increasing  project  complexity  and dynamics.  Effective  decision  making  needs  the  marriage  of  authority  and accountability  on-site,  not  its  divorce  to  some  remote  decision  maker. Simple, methodical alignment and monitoring of expectations reinforces this marriage to yield very tangible savings in time and money.

Great, but how can this help me?

This is probably the  first thing on your mind after reading this Blog.   How about asking us?  The first call is free!  Just email me to set it up.  Don’t wait, get PDS working for you!. If our conversation leaves you needing more, we offer at a reasonable fee telephone and video coaching on change, alignment, and executive performance that improve the bottom line.  If that still doesn’t do it, we’ll work with you on a solution.

____________________________________________________

___________________________________________________________________________________________________

For Help in Getting Your People on the Same Page
Nick Anderson, Senior Partner, PDS Group LTD
Ray Plamondon, PDS Group (Western Canada)
Rolf Wenzel
Ian Murray & Company Ltd.

direct 403-875-3310  fax 403-444-2008
www.imcprojects.ca

Listen to the Radio Show of this blog

© Copyright All Rights Reserved, IMC & PDS Group LTD and Walk the Talk – A Blog for Agile Minds, [2010-2011]. Unauthorized use and/or duplication of this material without express and written permission from this blog’s author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to Nick Anderson, PDS Group LTD and Walk the Talk – A Blog for Agile Minds with appropriate and specific direction to the original content.


Getting People on the Same Page – Seven Leadership Challenges

Listen to the Radio Show of this Blog
 
Like most consultants, we are often accused of borrowing the clients watch, tell them the time and then hand it back with a bill………So, given the threats to our economy, it’s a statement of the obvious. We live in turbulent times… only this time what follows is free.
I got to thinking what are the challenges of leadership in the times we are living in:
Some years ago I noted this quote:
Business is now so complex and difficult, the survival of the firm is so hazardous, in an environment increasingly unpredictable, competitive and fraught with danger, that their continued existence depends on the day-to-day mobilization of everyone’s intelligence”
(Konosuke Matushita, founder of Matsushita Electric)
It struck a chord…to mobilize everyone’s intelligence… for regular listeners you will recognize a theme in our work at PDS…releasing and focusing people is still a crucial ingredient to survival and sustained success

So, my focus in this blog is theSeven Challenges of Leadership in Turbulence

OK. I know you well enough by now to know there’s a core to these challenges…
Spot on….it’s Bravery…
Bravery is the capacity to perform properly even when scared half to death.”
Omar N Bradley
The first step “walk and talk – – – the same talk” constantly. Alignment between attitude, philosophy and actions is key!  That consistency is hard to find, particularly since producing a payoff in change is often more about emotion and intuition than it is about analysis and logic.
Where’s the bravery you ask?
Try making emotional and intuitive decisions which may or may not be born out by analysis and logic! Yet I like, Peter Senge’s viewpoint:
“high levels of mastery….leaders cannot afford to choose between reason and intuition, any more than they would choose to walk on one leg and see with one eye”
It’s that outward calm of seeing a swan glide across the water, yet below the water line…furious paddling.. It’s about not losing your head those around you are running around like chickens with their heads cut off…..what are we going to do….
The bravery comes to challenge how your company operates, its implicit beliefs and philosophies (e.g., The unspoken creed…once in automotive always in automotive).  Your culture can create its own distractions which interfere with what seems right, intuitive and obvious.   Many times, discussing this tension is repressed so that “we don’t take our eye off-the-ball,” or so we don’t offend others.  Consequently, leaders often focus on the seemingly “urgent” and let the critical issues slide.   They take refuge in “safe” financial performance targets that can’t be easily disputed.  These targets rarely support desired behaviors or intuitive outcomes.
Yet there are automotive dependent manufacturers in West Michigan that are wondering how to “keep it shiny side up!”
So in this fog of war, where do leaders look to survival?
If you look at successful companies, they have varied strategies, structures and systems.  However, their leaders do have something in common.  They share surprisingly consistent philosophies.
These successful leaders have moved away from over reliance on very formal ways of running their organizations (like articulating strategies, building structures and developing systems).  They have moved toward using more organic ways of managing (like engaging people in defining a purpose, implementing through necessary and defined processes and developing people).
So what does this point out?  It goes to the root of why so many change initiatives fail (60% +) even after overdosing on business re-engineering and other scientific management techniques.  Many Leaders manage what is easy to manage (like managing numbers and not people).  They’ve been trained in the scientific disciplines.  They forget they are managing an “organism.”  They dismiss the small and gradual steps associated with real change for grandiose strategies
So, let’s put this into perspective.  Successful leaders recognize that an organization’s purpose is more important than short-term outcomes.  Why?  Outcomes change – the purpose does not!  Their focus is on how they can create committed members of a purposeful organization.  Putting purpose above outcomes, allowing new improved outcomes to take precedence and promoting different things to be done takes bravery.
Why is bravery so important?
It takes bravery for leaders and executives to address seven critical challenges.  Without question, addressing them is about not acquiescing to “legacy tendencies but about incorporating “what now works” into the development of “tomorrow’s legacies”!  Bravery is about doing “different things,” not about making excuses as to why you can’t do different things.
Getting above the white noise of excuses is not for the faint hearted….getting up with clamor of resistances and fear
Where do we start with these challenges? Is there a sequence or are they inter-related?

Have you got Leadership Testicular Fortitude

1. Embedding Purpose

Where are you on the continuum from Undefined or Conceptual to Clearly articulated & translated?
So, you’ve written and articulated the corporate purpose!  But, do the troops actually understand what this means to their everyday behavior and actions?  So often the organization states its purpose without regard as to whether or not it has created any ownership in that purpose.
Essential Questions:
  • How will you gain widespread organizational support for your purpose?
  • How will you ensure new activities, actions and behaviors invigorate your purpose?
  • How will you ensure your expectations are aligned with what people assume is expected of them?

2:  Removing Distractions

Where you on the continuum from Unidentified to  Identified and Managed Distractions?
There are always distractions that deflect an organization from its “appointed” tasks.  If these distractions go unidentified, they grow stronger. Distractions don’t just miraculously disappear. The longer they last the more they clog corporate arteries. Executives need to lead the “charge” in identifying and eliminating distractions.
Essential Questions:
  • How will you convince people to dismiss actions, operations and processes which stimulate doing old things?
  • How can you eliminate duplicate processes and reports that slow the organization down?
  • Who will oversee the distraction-elimination process; and, what authority will they have?
I can see how that would help but does this really get over the fog of war…that we face today?

 

Getting People on the Same Page

3:  Aligning Organizational Expectations

 

Where are you on the continuum from Defused & Misaligned to Focused & Aligned Expectations?
Over and over again, employees say,
“I wish someone had told me exactly what was expected.”
Have you ever considered that others’ assumptions of “what is expected” might be counterproductive to your purpose or outcomes?
“Are people doing what you expect or what they think you expect?”
Essential Questions:
  • What are the key components that reveal your organization’s direction and success?
  • How will you translate these words into actions, competencies and behaviors that can be managed?
  • How will you measure the degree of alignment with your purpose, and what evidence of alignment are you looking for?
Doesn’t this demand more from a leader than just stating the facts?

Making clearer emotional connections

“Its alarming how one individual can undermine a change simply by being out of touch with intuition and empathy.  One of the most overlooked, yet common ways, leaders fail albeit unintentionally, is not to express appropriately, candidly and consistently what they feel as well as what they think. This is known as unintentionally ambiguous behavior which gives gives mixed messages. Next to aggressive behavior ambiguous behavior can cause the most tension for sellers and buyers alike” (Adapted from Robert Cooper’s book, Executive EQ.)

4. Creating Differentiation

Where you on the continuum from Competitively Vulnerable to  Differentiated & Own Your Niche?

If you feel like you’re the same in the marketplace, odds are that’s how the customer sees you.  As a leader, you are responsible for creating a climate of differentiation.

Essential Questions:
  • How will you ensure that customer contact people and others connect with one another to develop differentiable approaches?
  • How will you measure the degree and profitability of differentiation?
  • How will you leverage differentiation to lead your market place?
I can see how these first four create a platform for success…but how do leaders get this to stick and not just be another “flash in the pan”?

5:  Coaching Strategically 

Raising the Bar

 

Where you on this continuum from Coaching being Isolated & sporadic to Cascaded & Consistent throughout you organization?

We know, we know …. your people coach! The real question is, do your people coach with the right intensity and frequency to replicate successful behaviors? Or, is coaching infrequent, informal and isolated?
Essential Questions:
  • What will you do as a leader to establish your coaching cascade? (Starting with you, of course)
  • What is the right intensity and frequency of coaching needed under present competitive conditions?
  • How will you know that coaching is effective?
6:  Replicating Success
Where are you on this continuum fromUsing Lagging Indicators to Using Leading Indicators to replicate success?
The words, “best practice” seems to have permeated the corporate world.  Your people undoubtedly have their own practices of choice, honed by years of personal experience.   Often corporate rewards go to these people rather than to those who demonstrate the “best practices” that everyone can adopt and benefit from.
Essential Questions:
  • What will your real best practices look like?
  • How will you tie best practices to behaviors which can be evidenced and replicated without alienating the productive, “lone rangers?”
  • How will you use your “language of leaders” to make managing easier and more measurable?

7:  Rewarding Change

Where you on this continuum fromHistorical & Slow to Related & Responsive when it comes to Rewarding Change?
If the recognition and reward systems of your company run on “legacy,” it will only encourage doing things differently, not “doing different things!”   To change, you need to consistently reward the new behaviors, not the “reward legacies” of the past.
Essential Questions:
  • What proportion of people’s compensation should be tied to adopting the new behaviors?
  • How will you measure and reward those who support your purpose?
  • How will you “raise the bar” so that over time people demonstrate excellence in the new behaviors?
Where do you go from here?
Ensure that your “walk and talk” are consistent.  This relates to your language, how you reward excellence, how you coach and how you react when things go wrong!  Bravery means displaying an attitude of distinction.
Create a cascade of conversation and coaching that gets above the “white noise” of legacy…..that’s doing different things!
Align the expectations of the organization. Bravery is found in exposing misalignments and distractions for immediate correction.

Tip of this Blog

Look at your team/colleagues…whose up for a fight?
He that outlives this day

He that outlives this day

“He that outlives this day, and comes safe home,

Will stand a tip-toe when this day is nam’d,
And rouse him at the name of Crispian.
He that shall live this day, and see old age,
Will yearly on the vigil feast his neighbors,
And say ‘To-morrow is Saint Crispian.’
Then will he strip his sleeve and show his scars,
And say ‘These wounds I had on Crispian’s day.’
Old men forget; yet all shall be forgot,
But he’ll remember, with advantages,
What feats he did that day. Then shall our names,
Familiar in his mouth as household words”
(William Shakespeare, Henry V part of his speech before the Battle of Agincourt)

Listen to the Radio Show



_________________________________________________________

Great, but how can this help me?

This is probably the  first thing on your mind after reading this Blog.   How about asking us?  The first call is free!  Just email me to set it up.  Don’t wait, get TCA working for you!. If our conversation leaves you needing more, we offer at a reasonable fee telephone and video coaching improve bottom line results.
If that still doesn’t do it, we’ll work with you on a solution.

__________________________________________________

_____________________________________________________________________________________________________
For Help in Getting Your People on the Same Page
Nick Anderson, The Crispian Advantage

  E-mail I Web I Linkedin

© Copyright All Rights Reserved, PDS Group LTD and Walk the Talk – A Blog for Agile Minds, [2010-2011]. Unauthorized use and/or duplication of this material without express and written permission from this blog’s author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to Nick Anderson, PDS Group LTD and Walk the Talk – A Blog for Agile Minds with appropriate and specific direction to the original content.

Improving the Payoffs from Oil Sands Projects

Listen to the Radio Show of this Blog

This month I continue to look at different industries that have difficulty in implementing successful change. Last month we looked at the problems cutting red tape in local  government, this month we look at large Oilsands construction projects

Ugh?? Why? Bear with me readers….here’s some facts

  • Fact: Canada has the largest reservoir of crude bitumen in the world. Making Canada’s total oil reserves the second largest in the world, after Saudi Arabia’s.
  • Fact: Crude oil prices will go through the $100 pbl this year. Making Canada’s oilsands economically viable once again, especially with advances in production technology.
  • Fact: Forecasts say Canada will 5.0+ million barrels per day by 2035
  • Fact: In the last boom (2005-08) these projects ran notoriously over budget and behind schedule.

So, what’s going to happen in the next boom AND why should anyone care about what happens in the barren lands of Alberta?

Basically, the more delay in these projects, the greater the cost and guess who’s going to end up paying at the gas pump.  Here’s some disturbing evidence. In a recent survey of Oil & Gas Industry executives, most said they were:

  • Dissatisfied with project performance (40% of capital projects overrun); Highest ever level of dissatisfaction
  • Agreed that poor project performance is not acceptable when the market expects predictable strong returns.
  • Agreed that they can’t afford to miscalculate project risks, yet they don’t have a good grasp of how manage them.

(Booz Allen Hamilton “Capital Project Execution in the Oil & Gas Industry”)

You would think these executives would have their act together by now. What sorts of things did the survey identify were going wrong?

Good question. Another survey identified several things, including:

1.  Late scope changes

2.  Insufficient resources

3.  Poor support

4.  Poor contracting strategies

5.  Poor communications

6.  Poor project processes and controls

7. Poorly developed teams

8.  High Team turnover

9. Lack of stakeholder identification and engagement

(PriceWaterhouseCoopers 2004)

It strikes me that lot of these come down to people not being on the same page. For example, to what extent are late scope changes the result of inadequate communication between different groups?

Quite often. We find people in construction projects aren’t aligned early enough. For example, the owner may expect the Contractor (EPC) to have conducted a thorough review of specifications prior to start of drafting only to find out later the review was inadequate.  And the longer specification mistakes remain uncovered the more expensive they become to fix.

The key problem is layered change. It builds pressure to “to get on with it”. Under stressful conditions, the ramifications of meeting the latest change order are not fully considered. So, more change orders are approved without sufficient time or budget for professionals to consider their impact and cost. This sets up “wicked problem solving” – you “solve” one problem but create five more – and so on.( C. West Churchman, 1967)

We have seen this happen when three projects were running in parallel on the same site where increasing Change Orders led to increased Requests for Information (RFIs)

It reminds me of a Monty Python sketch – Mr. Creosote .  Creosote is an impossibly obese man who is served an enormous amount of food  After being persuaded to eat “just one more mint wafer”, he explodes in a very graphic way.

Another good example are Poor Partnering Strategies – Normally performance guarantees and risk sharing are agreed to contractually between, say, Contractor and Sub-contractor. But, invariably no one then takes preventative action align specific expectations to avoid their use. As many say, “if you have to get the contract out then we really are in deep do-do!”

What have you found to explain this a lack of specific expectations and how it contributes to these problems?

At the start of a project, construction people are under enormous pressure to “get on with it!’. So, they agree too readily to others’ expectations of them and accept others’ agreement of their expectations. This ready acceptance of expectations is especially true between professional disciplines and companies. The problem is people don’t really specify what is being agreed to. This only emerges when the expectation’s Receiver doesn’t deliver what was expected by the Originator and then the remedy is usually expensive. At its core is a lack of understanding of what alignment is really about. Alignment requires a Responsibility Shift between an expectation’s Originator and Receiver. Let me explain.

The Alignment Responsibility Shifts

When the Originator has an expectation, they are responsible to initiate discussion with the Receiver(s) (70% of the time this doesn’t happen – LOL)

Shift 1. If the Receiver agrees to the expectation, then the responsibility shifts to the Receiver. To tell the Originator what they will and will not deliver to meet the agreed expectation.

Shift 2. Now, the Responsibility shifts back to the Originator to assess the Receiver’s need for help to meet their expectation. (Contrary to what common sense would indicate):

Shift 3. and most importantly the Originator still has the responsibility to provide that help. For example, like briefing, coaching, advice, support etc.

Now, Originator and Receiver stand a chance of being aligned. The key is that success is more likely, replicable, faster and at reduced cost.

Give a man a fish and you feed him for a day. Teach a man to fish and you feed him for a lifetime. (Chinese Proverb)

Why don’t project management processes cope with this sort of problem very well?

Two factors. As someone once said:

“If everything is going according to plan, something somewhere is going massively wrong’

First. There is an over-reliance on such processes like accountability matrices (A grid of who does what, who they should consult and inform etc.). They fail to reflect the dynamics of a complex construction project. Back to Mr Creosote….it’s not so much about adding more! (Reporting, processes, communication etc.) but having clear expectations on how we handle problems and opportunities as they arise. Such rational planning processes needs strong emotional glue to be really effective. Let me explain.

Emotionally intelligent glue consists of compounds like trust, constructive criticism and holding each other accountable. And like glue needs “curing”. It needs controlled heat, and a blend of team members to initiate and harden commitments, just like using high-performance adhesives when you need  strong bonding.

The second factor compounds the problems of over-reliance on traditional project management processes. It’s the number of lines communications and deciding which are needed under pressured dynamics. Just take a 100 person project, potentially you could have 9,900 possible communication links.   Regardless of matrix, project or siloed command structures, you still need a way of managing the myriad number of cross functional, organizational and contractor expectations. And if not surfaced and managed will negatively impact project execution.

How do you respond to those that say, “ This is why we have all this technology available so that all those involved have access to what everyone else is doing?

But, somebody has to feed the technology. More reporting what’s been done comes at a price – Time and declining utility. Unfortunately technology has become a two-edged sword….efficient yet overwhelming. It produces so much data that it dilutes information and makes sense making difficult.  This then hobbles a team’s ability to cope with problems, delays and change and what they need to do.

Teams are most productive when they are bonded by the following curing process:

1.  Sustainable Trust leads to

2.  Healthy Conflict which leads to

3.  Solid Commitment which builds

4.  Owning Accountability which enables

5. Keeping Focused under the pressure of delays and problems

If these are not present cracks appear and quickly team adhesion fails. These cracks occur because expectation gaps and misalignments are not addressed early enough.

Let me explain how team adhesion is lost:

Lack  #1: Trust

When team members get unsure what others really expected of them; as opposed to what their company has committed them to legally. This uncertainty is then  compounded by cynicism from previous project experience. A typical cause of which is when:

“People get so absorbed in what they are doing that Key Stakeholders are not actively involved. This has led to tension between them and the project team”
Lack #2: Conflict

Lack of trust stifles teams engaging in unfiltered, passionate debate about key issues. This can develop into resistance to following through with expectations. Negative attitudes and unstated resistance occur evidenced by politicking,  and regressing into pure self interest.  Effective teams need to have:

“Iron sharpening iron, so one person sharpens the wits of another. (after Proverbs 27:17)

Lack #3: Commitment

Without conflict, it is difficult for team members to commit to decisions and ambiguity becomes the default. The resulting lack of direction and commitment can make project partners and teams disgruntled, falling back on required formal communication and lead to slower response times.

“We are reactive and respond too quickly to changes to understand the implications and impacts on other elements and groups”

Lack#4: Accountability

When teams don’t commit to a clear plan of action, even the most focused and driven individuals hesitate. They hold back from calling their peers on actions and behaviors that are counterproductive. This procrastination means correcting a situation becomes very difficult without direct confrontation of the issue for the overall good of the project.

“We could be better at identifying problems and their solutions before they actually occur.  We are too reactive and this slows us down”

Lack #5: Focus

Now the lines are drawn. Project team members circle their wagons. They fall back into the distraction of putting their own needs first. If a team has lost sight of the need for collective achievement, the project will ultimately suffer.

“We don’t reuse what has been done before – “Reinventing the Wheel” is costly and takes time”
“Measuring the impact of what we do is too subjective and lessens our ability to stay within budget”

These five cracks are rooted in problems of not aligning and managing expectations.

Expectation Gaps are like pot holes, the more you leave them the deeper they get. The impact of misalignment leads to cost and time overruns and then bleeds over into subsequent projects” (Nick Anderson, PDS Group LTD)

Successful projects are founded on:”Get Personal before you get contractual!”

In summary, no matter how well a project is planned, it is executing the plan that ultimately determines success. Project success demands authentic communication to align expectations and then track them methodically.  Tools  needed to measure, manage and facilitate easier communication and alignment of critical expectations among project participants

So, you’re saying that those managing complex projects, like oilsands, need to stand back and consider what they do differently…..if past delays and overruns are to be avoided?

Certainly, there’s a case to answer and look at a new way of Expectation Alignment for More Effective Project Management. Let’s face it, You Can’t Manage What You Cannot Measure

As many project people will us:

“Building the thing is not difficult compared to managing all the people involved”

So called “soft” skills need hardening. Effective Communication should not only be acknowledged, but recognized as a cornerstone of successful project management.  Why then is it so metric and data starved?  How can we manage what we cannot measure?

So, here are the questions that took us 10 years to answer effectively:

  • How do we develop measurable ways of effective Teamworking?
  • How do we assess people’s expectations of others with those others have of them?
  • How can we drive performance discussions between groups and individuals on their expectations and assumptions that result in:
  • Specifying clearer performance criteria against which individuals/groups will be measured
  • Removing expectations that are non-value added and not strategically aligned
  • Identifying significant issues to address for project advancement
  • Creating an accountability framework
  • How can we help people be more aligned and focused?

I guess the question in readers minds is: If you make such an investment what do I get in return?

The ROI for Oilsands Projects – Sources of Payback

Expectation Alignment has been successfully employed midstream to “projects in crisis”, but its highest ROI is realized as preventative medicine used in real  time to ensure proper project planning and execution.

We’ve covered Late Scope Changes and Poor Partnering Strategies of the 9 sources of failure. Let’s see how the others can be avoided or protected against by applying Expectation Alignment:

  • Optimized  resources / Better support Early definition of resource expectations all the way down the chain of command can avoid costly delays and expenditures.  Similarly, competency gaps can be identified sooner by engaging in expectation alignment processes.
  • Improved communications With numerous stakeholders involved in an oilsands project, static project charters and the like are not designed to manage the thousands of  changing expectations.  Successful project execution rests on agreeing, discarding or identifying the unresolved…   Expectation alignment methods identify teams and managers who are especially strong or weak at communicating .  Coaching or other remedial actions can thus be undertaken and the results monitored.  
  • Accountability Tracking Expectation Alignment’s regular and measurable process of developing and agreeing project expectations are taken to a level needed for a given project.  Unlike project reporting which can often identify symptoms, Expectation Alignment tools also make accountability for task execution highly visible.   Expectation Tension Ratings may also reveal important tasks that are not necessarily on the critical path but can have huge ramifications to project schedules or budgets.
  • Better Team DevelopmentThe Expectation Alignment process demands that Expectation Originators ensure that Expectation Receivers have the competency and resources to complete the required tasks.   In situations where senior managers are working with junior personnel, assumptions are often made on their level of process knowledge and industry practices.  Expectation Alignment addresses these issues by facilitating the alignment conversations that reveal experience gaps early enough to develop people and avoid later termination.
  • Effective Contracting StrategiesIncorporating subcontractors and key suppliers in the Expectation Alignment process often reveals owner expectations and other stakeholders are not captured in specifications and contracts yet play a significant part in them being effective
  • Reduced Team Turnover Again consider the 5 key” Project Dysfunctions”. (Absence of trust, fear of conflict, lack of commitment, avoidance of accountability and inattention to results). Getting teams participating in facilitated expectation alignment sessions creates an objective assessment of team stressors and progressively builds a more robust and productive project team culture.

Based on this foundation , Expectation Alignment becomes an effective tool to getting new people up to speed and address competency gaps before their credibility is damaged

  • Improved Stakeholder Engagement while inclusion of all stakeholders seems an obvious remedy to avoiding later project problems, the explicit definition of mutual expectations, especially of external stakeholders can yield big paybacks. The process that enables external stakeholders to explicitly state their expectations and have them acknowledged also build good relations both in the current and subsequent projects.

In summary, where project delays are millions of dollars per day, the simple alignment and monitoring of expectations to make the many thousands of required daily decisions more accurate, is strongly beneficial and has been shown to result in very tangible savings.

Tip of the Blog

Here are some questions that are crucial to successful project execution. The above benefits accrue when all people understand:

  • What is expected of them
  • What they can expect from others
  • How well they are strategically aligned
  • How their performance is measured and compensated
  • What they can stop doing
  • What they need to focus on
  • What information and resources can be used to achieve their goals
  • How they are going to be supported and coached

Listen to the Radio Show

Great, but how can this help me?

This is probably the  first thing on your mind after reading this Blog.   How about asking us?  The first call is free!  Just email me to set it up.  Don’t wait, get PDS working for you!. If our conversation leaves you needing more, we offer at a reasonable fee telephone and video coaching on change, alignment and executive performance that improves the bottom line.  If that still doesn’t do it, we’ll work with you on a solution.

_______________________________________________

________________________________________________________________________________________________________
For Help in Getting Your People on the Same Page
Nick Anderson, Senior Partner, PDS Group LTD
E-mail I Web I Linkedin

© Copyright All Rights Reserved, PDS Group LTD and Walk the Talk – A Blog for Agile Minds, [2010-2011]. Unauthorized use and/or duplication of this material without express and written permission from this blog’s author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to Nick Anderson, PDS Group LTD and Walk the Talk – A Blog for Agile Minds with appropriate and specific direction to the original content.

Implementing Sustainable Change – Leadership Challenges

Walk the Talk – Radio for Agile Minds – Change Management – Our Beliefs Change Management – Our Beliefs

Regular readers will remember I was talking about how many change projects started in response to the worsening economy yet almost half of the respondents said that a significant amount of change projects failed to meet their stated goals.

Cutting Red Tape in State, Provincial & Local Government

Listen to the Radio Show of this Blog

Over recent months, we have covered what creates successful and sustainable change in the corporate world. Why this focus for our business community? Why should it concern you?

Studies continue to show that up to 70% of all change initiatives fail. Why?

Certainly, the issues and challenges organizations face today are more complex than ever before. But still most leaders don’t appreciate the need for high-involvement change strategies to lower resistance and generate buy-in to change. Without such strategies to engage and involve people, organizations often fall short of delivering promised benefits. Even worse such shortfalls negatively impact productivity and morale. Add to this the time and money wasted and we should be concerned.

Now, let’s move to this month’s theme. How to cut the red tape in State, Provincial and Local Government. Why? Many people voted for change last October or November because they didn’t see things changing, but how much more difficult is it to change these organizations? For Example Naheed Nenshi’s “cutting the red tape” podcast that contributed to his election for Mayor of Calgary

The first thing leaders have to cope with is more complex politics. On top of internal politics that exist in any organization they also have the political dynamics of executives, elected representatives and their appointees.

Secondly, most change is frequently opposed by at least some proportion of the electorate, population and political class.  Change is difficult and unpopular for some of those affected. What this means is that when the @#$% hits the proverbial fan, it doesn’t quietly go away – it explodes and everybody knows about it (especially if the press, opposition and those adversely affected are doing their jobs). For good or ill, whether it is effectively managed or poorly handled, change in government is far more public.

Thirdly, the addition of an audience to any activity increases the strain on performers. Few audiences are larger, more demanding, or more critical than taxpayers. Few activities draw a larger crowd than those that purport to ‘change’ something. Few elected officials have had to cope with viral social media.

So, it makes me think how does anything get done?

Aside from major crises like the attack at Pearl Harbor, the Cuban Missile Crisis and more recently 9/11 such disparate interest groups are not motivated to act in concert. Like any newly elected body, they want to be the “New Broom” and give the electorate what they voted for. Unfortunately, they frequently lack sufficient understanding of how to implement change. Too often they have limited understanding of the complexities, intensity and resources needed to overcome organizational and political inertia.

In practical terms, as reality sinks in, they learn the insufficiency of resources or political power to push things through. In reality, most of those newly elected are astonished to learn how little a mayor, governor or even the President can do unilaterally. Of course, politicians don’t help themselves by making unrealistic promises during campaigns.

Consequently, they are drawn into launching their changes prematurely by using normal decision-making processes. This is sometimes called “Death by Committee as the necessary compromises and dilutions occur just to get things done. The reality is that the actual machinery required to implement change is the very same which is traditionally most opposed to it. For example, in Calgary, the newly elected mayor, Naheed Nenshi campaigned on “cutting the red tape” especially reducing the rules on planning and zoning. Guess who will implement these changes? The very officials who administer the current rules will have to streamline the permit process and advise those elected on interpretation of the new regulations.

But it’s only natural that in trying to get things done, the path of least resistance is adding rather than replacing departments, people, processes and regulations. The outcome is invariably another layer of barnacles encrusting the organization’s hull and slowing progress.

Where did you think the term “Red tape” came from?

It is used to refer to the seemingly endless parade of paperwork that accompanies official matters. Originally, thick legal documents were bound or tied with red tape. By the 19th century the term had become pejorative referring to “any official routine or procedure marked by excessive complexity which results in delay or inaction.”

It is the process of “layering regulatory barnacles” that builds upunnecessary rules, paperwork, licenses and approvals that make conducting your affairs slower, more difficult, or both.

Here are  some examples “Rules That Refuse To Die”

During the Boer War, a British artillery gun crew consisted of 5 men. 1 man carried ammunition, one man loaded the gun, and one man fired the gun. The other 2 men stood at attention. An efficiency expert was brought it to find out why. It turns out that the 2 men standing attention were there to move the horses. The problem was that the British artillery no longer was using horses.

In England (1963), a taxi driver was charged under Section 62 of the Town Police Clauses Act, 1847, for leaving a taxi-cab, unattended in a side street where, apparently, there was no traffic of any

Hackney Carriage

kind….. Section 62 reads…”If the driver of any such hackney carriage (taxi) leave it in any street….without someone proper to take care of it, any constable may drive away such hackney carriage…and the horse or horses harnessed thereto, at some neighboring livery stable…”..

In Calgary Alberta, there is still a by-law that requires businesses within the city to provide rails for tying up horses.

And where else but in California . . . .  it is illegal for a vehicle without a driver to exceed 60 miles per hour.

How do these complexities affect managing change in such bureaucracies?

This regulatory layering effect tends to develop “Manager Experts”. They are the people who have captured the organization’s wisdom. This often leads to a condition where they tend to excessively focus on procedural trivia rather than on overall performance, quality and results. This focus on “low-level” trivia often delays decisions, clouds overall goals and objectives, and restricts the flow of information between employees.

Unfortunately, such managers rarely see anything wrong in their behavior. They often rebut criticism by seeing themselves as “structured” or “organized.“Manager Experts” then fall into the trap where they not only tell a subordinate what to do, but they dictate how to do it. Ultimately, such managers then delegate accountability for failure but not the authority to take alternative, successful  actions. This is compounded during  distressed economic times and government  cuts—the pressure to keep your head down and not take risks is ly acute. Rare is the government employee willing to innovate or try new things with the potential risk of losing one’s job as a result. It’s much safer and easier to play a waiting game and keep your head down. And above all, guard knowledge jealously.

In a time of turbulence and change, it is more true than ever that knowledge is power

John Fitzgerald Kennedy quotes (American 35th US President (1961-63), 19171963)

Regardless of managers’ motives, potential effects include:

  • Resentment and mistrust in both “vertical” and “horizontal” relationships
  • Interference with existing teamwork and inhibition of future teamwork
  • Disengagement, often to the point that employees label their manager as “control freaks.”
  • Suppression of creativity and constructive criticism that could otherwise lead to internal reform
  • Increased turnover, as subordinates feel the only way to change their workplace environment is to leaveDamage to the organization’s reputation, as those who felt they had leave  have few reservations about speaking out frankly The resulting damage may even increase insecurity among management, prompting further micromanagement to cope with this insecurity.

What can new leadership do to counteract this negative spiral?

By the time new political leaders arrive on the scene they are facing an uphill struggle. Usually, this culture is widely internalized as “standard operating procedure”, compounded by employee distrust of the new leadership. Now, you can see why newly elected leaders might not consider loosening the reins as a viable course of action.

Getting rid of this must be a “root and branch” approach to be successful. Essentially:

  • The head of the organization must have the authority, independence and then represent all divisions simultaneously so factions and fiefdoms are not emboldened.
  • The leadership team must exhibit the attitude and specific actions that demonstrate complete disinterest in factional or political positions – they must be seen to serve the organization’s best interests and its citizen’s charter.
  • These attitudes and actions require a “loosening of the reins” throughout all divisions, even at the very times when individual managers feel most tempted to seize and maintain personal control.  For example, during times of hardship – for instance when all divisions are under scrutiny as potential targets for cutbacks.

    Loosen the Reins!

The first two criteria I see the need for, but can you give examples of “loosening the reins”?

It comes down to aligning and realigning expectations to navigate change obstacles. It may be too steep to suggest that such a process makes change easy (or popular) in a bureaucratic setting, but it can make change management easier. The simple reason is that aligning expectations maximizes output by streamlining input: it creates efficiencies by removing inefficiencies. Politically speaking some voters will like a particular change, others will not – but all of them appreciate efficiency in government’s bottom line.

Establishing an Accountability Culture must ensure from the outset that any change effort is capable of objective measurement, and that “policing” is seen to be fair, consistent and unflinching. It has to be that way to handle the inevitable denial and “finger pointing” between subordinate managers who retain a vested interest in the status quo.

The essential foundation for accountability is when stakeholders understand or realize each others’ expectations.

It sounds simple, but managing the complexities of multiple stakeholders’ expectations can be daunting! especially as it requires a high degree of trust in the intentions of the other…something that seems to be in short supply, certainly in American politics.

Initially it starts with a general flow like this:

  • Develop a consensus of those alignment components with all Leaders & Stakeholders – in this case, those about “loosening the reins” across all divisions.
  • Coach Leaders in generating performance expectations for each alignment component
  • Provide analysis and feedback to the leadership team, isolating key initiatives to embed change and head off resistors
  • Develop sufficient trust and transparency as the means to eliminate factional conflicts
  • Use accountability and evidenced based management as the means to accomplish and maintain momentum
  • Facilitate managers to coach others to reach higher performance standards that meet their expectations
  • Develop a reward system to reinforce the change.

The Heart of Changing the Status Quo – Enabling Delegation

The core of “loosening the reins” lies in Managers being expected and required to delegate responsibilities to others who have the ability to “hold the reins.”

Enabling others to do a job for you while ensuring that:

  • They know what you want
  • They have the authority to achieve it
  • They know how to do it.

Communicating clearly:

  • The nature of the task
  • The extent of discretion
  • The sources of relevant information and knowledge

To get to the state where effective delegation can flourish people need to be aligned.

What is alignment?

Clear Expectations

–  Validating & agreeing statements about what two people expect of one another

– Agreeing on measureable deliverables that will evidence fulfillment of each expectation.

Mutual Accountability

–  Accepting responsibility & authority for agreed upon expectations between two people, for tasks performed & results achieved

– Accepting positive or negative consequences of that performance.

Real Alignment

Real “loosening of the reins” ranges from the formal to informal.  Yet for any change effort to stick, managers and leaders have to constantly reinforce the need for effective delegation. This inherently involves coaching, particularly when expectations relating to effective performance are made explicit. It is the responsibility of the Originator of any expectation, usually the Receiver’s Manager, to gain agreement to it, and the Receiver’s to give the evidence they are going to meet it. This is a very effective way of reaching mutual understanding so that the rating of performance and coaching is objective and “loosening the reins” becomes a reality.

So, , it seems that government might also practice some of the key management practices we’ve talked about in past blogs?

That’s right , but of course, the common sense of that action may totally escape our political (“P” or ”p”) leaders, even though they may have practiced some of it in a former life. What is more difficult for those managing change in local or provincial government is the current political landscape. It bears the scars of intrigue and scandal. People both in the USA and Canada are looking for greater transparency and simplification. Without these two, their positive judgment as to the fairness and honesty of governance will be unlikely. For example, Google, “political scandals Canada” and you get 336,000 hits including Dar Heatherington – forced to resign from Lethbridge City Council in 2004 after being convicted of public mischief.

So, what would your Tip of this Blog be?

I have a lot of time for Naheed Nenshi in his inclusivity and transparency in Calgary; he is a breath of fresh air to those dusty city halls. He knows that the heavy lifting starts now.

My advice to him and other recently elected representatives would be to ensure that expectations between stakeholders are publically available so people can see just how implementation is progressing before concrete results are demonstrated. I recommend that a progress report is issued to show:

  • What expectations have yet to be discussed
  • Which expectations have been agreed and what is being delivered as a result and by when.
  • Which expectations have been discarded (really important to stop doing things if you are to cut red tape)
  • Which expectations are unresolved for either or both the executive and elected officials to debate

Listen to the Radio Show

Great, but how can this help me?

This is probably the  first thing on your mind after reading this Blog.   How about asking us?  The first call is free!  Just email me to set it up.  Don’t wait, get PDS working for you!. If our conversation leaves you needing more, we offer at a reasonable fee telephone and video coaching on change, alignment  and executive performance that improves the bottom line.  If that still doesn’t do it, we’ll work with you on a solution


_______________________________________________________________________________________________________________________________________________________
For Help in Getting Your People on the Same Page
Nick Anderson, Senior Partner, PDS Group LTD
E-mail I Web I Linkedin

© Copyright All Rights Reserved, PDS Group LTD and Walk the Talk – A Blog for Agile Minds, [2010-2011]. Unauthorized use and/or duplication of this material without express and written permission from this blog’s author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to Nick Anderson, PDS Group LTD and
Walk the Talk – A Blog for Agile Minds


 

Top Down or Bottom Up – Making Change Personal

By Contributing Blogger – Terry Merriman, PCO Associates

Implementing successful and sustainable change is tough, strategic change initiatives fail two-thirds of the time in North American business (Kotter, 1996, and McKinsey, 2009).  How can your organization succeed?  You can succeed by making change personal!  Remember, performance is personal before it is organizational.

Isn’t this a truism, a matter of common business sense?

Since when was common sense common practice! It is common for many leaders to plan their change initiative, communicate it to their leadership team, tell the organization to watch for it, set some goals and measures, and incorporate the goals in their team and department objectives.  Then, the change dies and the leadership team wonders why.  The answer; the change was never translated into personal action!

If your people don’t embraced change and those in your value chain (including your customers and vendors) it will fail.  Why?  If your people do not understand the change initiative, buy into it, and integrate it into their daily activities, it will not work. Consequently, planned change and personal action don’t mesh as people are skeptical, don’t understand why, don’t see the need, and don’t know what’s in it for them.

So how do you make change personal?

Define, Communicate, Delegate and Track change related expectations. We usually get the organization’s side of change, define and communicate, pretty well.  Where we fail is in putting the personal side of change, communicate, delegate, and track, into play.

  • Define the change in terms of broad categories of activity to which everyone in the organization can relate, and specific results that benefit the organization and its people.
  • Communicate the change initiative, and include the message that leadership will be expecting everyone to participate by defining specific expectations of each other necessary to carry out the change.
  • Communicate More, by focusing on individual working relationships by:
    • Get each leadership team member identify specific expectations of each other as to what they must do to successfully implement the change.  Ensure the expectations are Specific, Measurable, Achievable, Realistic, Time and budget bounded, Ethical and Recorded.
    • Have each leader discuss their expectations of the receiver expected to execute, and ensure each accepts accountability for each other’s expectation.  This helps to create a productive relationship and integrate the change into the business at the leadership level.
  • Delegate by cascading the above process to each leader’s direct reports, peers, and business partners to those teams that are considered key players in the change initiative.
    • Ensure people delegate not only the responsibility and accountability but also the authority to execute each expectation. In this way people can develop ownership of  those expectations other have of them.  This step integrates the change throughout the organization as it becomes a part of each person’s work responsibilities and commitments.
    • Ensure each expectation’s originator is held responsible for assessing the receiver’s ability to meet their expectations and coach them to develop their competence.
  • Track each expectation’s results.  This means each person holding accountable the person who agreed to meeting and reporting progress to an expectation’s completion.  So, the Accountability Culture is born.  The expectations approach challenges leaders and their direct reports to get personal first perspective and serves to foster improved communications between them.

The Expectations Approach makes change personal by casacading accountability for implementing change throughout the organization in a way that helps people understand the reasons for and expected results from the change, and buy into it.  We’ve found it one of the most effective ways of implementing successful and sustainable change in organizations.  The side benefits of this approach are that it improves accountability throughout the organization, and encourages creation and development of productive relationships between people, leading to improved organizational performance.

Where has this approach been used succesfully?

This approach has been successfully employed in Fortune 500 companies and family owned businesses, from new selling strategies to management transitions (See Project Summaries) It has been  shown to work in for-profit and non-profit organizations from large to small, and it also works in government organizations (it’s been used in the British Navy by its developer, John Machin).

“Change is Hard and Real Change is Real Hard!” If you want to be successful at change, you have to be prepared to tackle the hard part of change – making it personal.

Listen to The Radio Show



Great, but how can this help me?

This is probably the first thing on your mind after reading this Blog.
How about asking us?  The first call is free!  Just email me to set it up.
Don’t wait, get The Crispian Advantage working for you!. If our conversation leaves you needing more, we offer at a reasonable fee telephone and video coaching improve bottom line results.
If that still doesn’t do it, we’ll work with you on a solution.

_________________________________________________________________________
For Help in Getting Your People on the Same Page 
Nick Anderson, The Crispian Advantage

E-mail I Web I Linkedin

© Copyright All Rights Reserved, The Crispian Advantage and Walk the Talk – A Blog for Agile Minds, [2010-2012]. Unauthorized use and/or duplication of this material without express and written permission from this blog’s author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to Nick Anderson, The Crispian Advantage and Walk the Talk – A Blog for Agile Minds with appropriate and specific direction to the original content.

Have you got your Change Shoes on? –

Now, that’s a change shoe!

Sustainable change is based on leaders having a radical vision and building a pathway to that vision one step at a time.

Just as you wear a pair of shoes, this change walk has the left shoe – radical, right shoe gradual –  Radical Gradualism

That got me to pose this question:

“What is the glue that holds an organization together while it goes through change?”

Relationships – the golden triangle of your people, your customers and your partners.So, that’s the pathway today – creating and holding on to that human glue that produces success

“Where’s the evidence to support your track this month?”The answer seems obvious…but…why is this facet of business becoming more important?

Traditional rationalization and cost cutting strategies fail too often – too many business turnaround failures. These traditional approaches, which are predicated upon cost efficiencies, have left companies demoralized, distracted and less productive.

If you look at the data – pure light

Successful leaders transform their organizations doing several things, like:

  • Building closer relationships with customers while harnessing human talent to deliver greater customer satisfaction: HP’s competitive strategy vs. IBM Mini Computers
  • Leveraging internal resident talent and expertise to resolve business problems and capitalize on opportunities: 3M Post-It Note
  • Fostering a climate that results in personal ownership for doing what’s needed:  HSBC’s Customer First Change Process in the UK
  • Devolving responsibility to groups and teams create a project based organization: Volvo pioneered work cells – one team-one car
  • Raising the importance of individual and organizational learning, ensuring learning and working are integrated: KPMG link learning to career progression
  • Secure changes in attitudes and behavior: Fred Smith, FedEx “Anywhere,Overnight, Guaranteed”

“In the military, leadership means getting a group of people to subordinate their individual desires and ambitions for the achievement of organizational goals. And good leadership has very measurable effects on a company’s bottom line.”

My call to action: Challenge your attitudes, values and your behavior. They are the sole of your change shoes, rather than just focusing on your technology, products and services – all of which can be copied.

Some would say that other things like the right “goto” market strategy with the right distribution channels etc. So, have we got a chicken and egg situation like what comes first

People or Process or Structure?

Good point, but consider this: the days of ready, aim, fire have long gone, it’s been ready, fire, aim for some time. Few startups succeed – e.g. new restaurants close before their first anniversary. The change paradox is this “hurry slowly” – radical gradualism is a simple concept rigorously implemented

Let’s put it another way: At least three separate disciplines drew essentially the same conclusions about change and project management:

WYSIWYG-( What you see is what you get) is no longer reality. It’s IWKIWISI (I’ll Know it When I see It!) that reflects our world today

Like a lot of what you say seems common sense…why don’t more companies take this approach…?

Many factors….one telling fact  is that average age of senior executives while falling is between 46-50 yo.So, they graduated between 1978 – 1982….Who had a laptop let alone a cell phone? At that time business schools still held on to a Fortune 500 view of the world and seeing the world through the lens of the Harvard Business Review. Let me ask you – What percentage of businesses is of this size in West Michigan? – Not many. So, the enculturation of managers was still “ready, aim, fire”

Bosses are turning still turn a deaf ear…Bosses are ignoring a wealth of creative ideas from
their employees

  • 1:4 people believe that they are never listened to by superiors
  • Among older people the proportion rises to nearly 1:2!
  • 1:4 never been asked by their bosses for their opinion or actively encouraged to offer up ideas, no matter their length of service.
  • 1:2 Canadians surveyed believe that their companies use half or less of their brain power
  • Surveys – NOP Survey 1000 (London & South East) & “Report on Business” Magazine Dec 1998)

Do you see this trend getting worse?

 

Employees want bosses to listen better

In the Leadership Digest, in 2006 – While employees gave their bosses “high marks” in a recent study of worker satisfaction, staff still suggested areas for improvement:

  • 43% want bosses to use their employees’ skills and abilities better.
  • More than 35 % want the boss to step in more often to resolve conflicts.
  • Just over 25 % wish bosses would ask for their ideas and listen more readily.

So, it depends on how business leaders react. Let me explain, based on James Brian Quinn, Philip Anderson, Sydney Finkelstein,with rare exceptions, productivity lies more in intellectual and systems capabilities than say raw materials, land, plant, and equipment. Intellectual and information processes create most of the value-added for firms in the large service industries–like software, medical care, communications, and education–which provide 79 percent of all jobs and 76 percent of all U.S. GNP.

In manufacturing as well, intellectual activities–like R&D, process design, product design, logistics, marketing, marketing research, systems management, or technological innovation–generate the real value-add. McKinsey & Co. estimates that by the year 2010, 85 percent of all jobs in America and 80 percent of those in Europe will be knowledge-based. Yet few managers have systematically attacked the issues of developing, leveraging, and measuring the intellectual capabilities of their organizations.

What are the other pitfalls in creating this service based economy and how does it relate to relationship development?

The more knowledge workers, the flatter the organization which impacts the style of leadership and how wealth transitions from one generation to the other or to new owners. This economy is and will become more dynamic.

Can you explain what you mean wealth transition?

Dynamic = more transitions – buying and selling, merging acquiring. But, What gets missed? Capital is no longer about bricks and mortar – it’s Human Capital

So, what challenges does this present? What can you do to build value in these circumstances?

The greater reliance on human capital for valuing an organization the more PE firms, M & A need to look at tools to assess the real value. This means doing the obvious things of doing inventories of the people, their skills, competence and certifications, where needed to redress findings like:

  • Only 1  in 10 can consistently achieve their Strategy’s  full potential
  • Non-Financial Factors valued most by investors
    • Strategy Execution
    • Management Credibility
    • Innovativeness

What are the main things executives have to do better?

Fulfills others: Take risks, trust each other, take  proactive approach that we will work together on solving problems, share considerable confidence in their own and others abilities, have enthusiasm for their jobs.

Providing effective feedback is one of a manager’s most important tasks; it’s also one of the most difficult. Here’s a six-step model, proposed by Jack Stahl, current CEO of Revlon and former president of Coca-Cola, to facilitate feedback and make it more effective.

  1. Value the individual. Begin by affirming what the employee contributes to your organization. Be sincere and thorough. This step is critical because it frames the conversation.
  2. Ask the person to identify his/her biggest challenges. Ask the employee to assess his/her performance, including both strengths and challenges. This will help you pinpoint areas for targeted coaching.
  3. Provide targeted feedback. Give specific examples of behaviors to change.
  4. Agree on areas to develop for the future. The objective here is to focus the individual’s development and encourage him/her to practice specific new skills. You could also point him/her to training opportunities.
  5. Agree on the benefits of improving and the consequences of not improving. This step is designed to fuel the employee’s motivation to improve or change.
  6. Commit your support and reaffirm the person’s value. “When people feel valued, they can hear difficult feedback without being demoralized by it.”

Great, but how can this help me?

This is probably the first thing on your mind after reading this Blog.
How about asking us?  The first call is free!  Just email me to set it up.
Don’t wait, get The Crispian Advantage working for you!. If our conversation leaves you needing more, we offer at a reasonable fee telephone and video coaching improve bottom line results.
If that still doesn’t do it, we’ll work with you on a solution.

_________________________________________________________________________
For Help in Getting Your People on the Same Page 
Nick Anderson, The Crispian Advantage

E-mail I Web I Linkedin

© Copyright All Rights Reserved, The Crispian Advantage and Walk the Talk – A Blog for Agile Minds, [2010-2012]. Unauthorized use and/or duplication of this material without express and written permission from this blog’s author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to Nick Anderson, The Crispian Advantage and Walk the Talk – A Blog for Agile Minds with appropriate and specific direction to the original content.

Top Down or Bottom Up Approaches to Successful Change

Ideally your approach to change would be personal!  You make sure your team members buy into it, own it, implement it, and are rewarded for it in their work relationships. Yet, today we still see many leaders using Top Down Change as the default approach without considering the impact on productive relationships.

Why is building productive relationships so important?

As somebody once said, “Performance is Personal Before it is Organizational”.  None of us work in a vacuum.  Improved workplace performance requires productive relationships with peers, bosses, subordinates, customers, clients, vendors, suppliers, and the community.

What is the essence of productive relationships?

In our survey of 1072 business leadersFocusing Change to Win contributors indicate that their organizations change at least annually. These changes are often unique to their organization from the triggers for change to  how it’s managed. Yet, all change has three things in common.

The Three Common Elements of All Change

The Expectations Change Framework

It starts by defining your change in terms of :

  •  Identifying what you expect people to stop doing
  • Specifying what you expect people to start doing
  • Confirming what you want people to continue doing

Then, focus on communicating constantly:

  • Why Change
  • What is Expected and
  • What the change is not

This is the Change Expectations Framework which engages deeper understanding and helps everyone manage stress more effectively.

Just in case you think everyone does these three steps, you are probably wrong at least 70% of the time, according to studies over the last 10 years.

The crucial step, and often missed step, is facilitating feedback from your stakeholders. What they want you to start, stop and continue doing in return. You have the responsibility to set the Expectations Framework but the what and how of change comes down to aligning expectations. Then people can:

  • KNOW  WHAT MATTERS
  • DELIVER WHAT MATTERS
  • TAKE RESPONSIBILITY FOR WHAT MATTERS

What are the benefits productive relationships?

Many Hands make light work

  • Greater clarity and trust
  • Increased competitive agility
  • Faster decision making
  • Progress metrics focus on what really matters
  • Greater confidence in doing the right things right
  • Accelerated performance towards people’s potential
  • Improved extent and quality of delegation
  • Better motivation as people know what success looks like

How do you reconcile this approach with a top-down approach?

Continue reading