Focusing Change To Win Series – How Can You Lead to Thrive?

Series Introduction

This is the eighth in the series of highlighting contributions from 1072 Business Leaders and Consultants from 80 countries in 19 Industry Sectors detailed in our book Focusing Change to Win. Each blog gives some of the key findings and a sample of useful tips. In this blog we are focusing on How Can You Lead to Thrive? Here are the other book sections we are highlighting:

  1. Why is this book important?
  2. How is your “What” connected to your “Why”?
  3. Why do people resist change?
  4. Why bother measuring change?
  5. How can implementing change gain competitive advantage?
  6. Is your organization thriving or surviving?
  7. How effectively are you communicating change?
  8. How can you lead to thrive?

 

8. How Can You Lead to Thrive?

Clearly from this survey, leadership skills that focus change to win are at a premium. Today, change is the norm. It is neither random nor regular but hovers somewhere between. How these interrelationships arise and how they challenge organizations is not well understood (IBM & KMPG Surveys endorse this)

Why should leaders focus on their organization’s essence?

An organization’s essence is the amalgam of mission, vision, values, intent and ethics. These components should be the focus of aligning and realigning people rather than delivering the corporate directives after a strategic planning retreat. Sustaining an organization’s essence is a dynamic that requires everyone’s engagement to define and redefine under changing situations.

It’s only by leaders “inter-reacting” that they can develop people’s shared clarity about the organization’s essence – “what we stand for!” From shared clarity comes confidence, from confidence comes cohesion and from cohesion comes the freedom to decide and act. That’s how organizations will stay on track today. Many people making many decisions true to their organization’s essence.

It’s also expected that some employees (including some executives) will not “buy into” an organization’s Essence once it is clearly defined.  Leaders should then be ready for those employees and managers to transition out of the organization. This will benefit them and organizational cohesion

What are the dangers of using technology to increase control?

Technology increases the illusion of greater control which can feed a leader’s “Control Addiction”. More measurement equals more control. But measuring what is easy to measure can have the very opposite effect. The problem is that most of what is easy to measure has already occurred. What is difficult is dealing with the factors that are difficult to measure and with forecasting what is likely to happen down the road. We can’t spend more time looking through the “rear view mirror” when we have a winding road ahead of us. Technology’s cheapness and speed feeds this addiction with the past and “looking in the rear view mirror” by access to ever more data and information at the cost of acquiring knowledge and wisdom.

This condition is worsened by technologists clinging to largely sequential design and deployment processes which are not fully user or client inclusive, e.g. “Waterfall Process”.  Contrast this with agile processes which are fully supported by our contributors. See the link to comparing the Waterfall Process with Agile Methodologies.

Why do we have difficulty developing leaders that can thrive in today’s conditions?

Today’s conditions are not good proving grounds for the leaders we need. More of doing more with less, multi-tasking and the growing doubt that we may be doing the wrong things means that decision-making, and expectations are now more compressed. Consequently, entrenched expediency leads us into solving one problem so quickly that we find we have now created five more problems. We are so busy trying to solve problems there’s no time for “Where the hell are we going?” These conditions are not good for selecting or developing leaders who can work well under fluid and complex conditions.

How do we develop leaders that can thrive?

The tension between what Leaders want to achieve and their current culture prevents traditional leadership training from making a significant impact. For example, many leaders’ previous training has left them feeling that they could do a better job doing it themselves. Of course, too often this has not happened together with little sign that they have addressed their own or their junior leaders’ performance issues. The consequence is that leading up to a change they lack confidence and skills to handle the natural uncertainty that change creates. Consequently, they default to avoidance and expediency and as a result staff resistance rises morale suffers.

The conclusion is that Leaders need to develop a better framework to assess their competence to lead people, make the next and later changes more effectively.

In this section we outline how leaders can be developed to increase their chances of achieving both measurable short- and longer term results than traditional leadership training. It is based on approaches:

  • Aligning People – Getting people on the Same Page
  • Action Learning – Solving Difficult Problems while developing leaders’ skills

A Final Thought

Our position is that it’s only by energizing people and harnessing technologies better than anyone else that organizations can survive and thrive. Genuinely aligned, empowered and collaborative people will outperform the competition every time. A leader’s role is to create successful change that fulfills people and avoids human casualties. Leaders need to create working relationships that are rewarding not just superficially productive.

Action Points 7: Leading to Thrive

A Leader’s greatest impact is when they motivate their followers to action by appealing to their shared sense of their organization’s essence. Use these questions to rate your leaders’ abilities:

  • To what extent do your leaders focused on developing rewarding not just working relationships?
  • How reliant are your leaders on “command and control”?
  • How well do they really engage those they lead?
  • How well do they foster a culture of collaboration? Consider both internally and externally.

Leading to the Essence

Do your people know what your organization stands for? Specifically:

  • How well understood is the organization’s essence? (mission, values, intent and ethics)
  • How well aligned are my people with the Organization’s Essence and where it’s headed?
  • To what extent do leaders use the essence to guide and coach their people?

Developing Leaders

  • To what extent are you distributing and empowering leaders at all levels.
  • What evidence do you see of true “inter-reaction” where success and failure are openly discussed?
  • To what extent do they then take lessons learned and use them to repeat success and avoid failure.
  • How well do they use processes to help people stand back, objectify problems and make people’s thought processes transparent?
  • To what extent does the urgent drive out the important and mask how things accumulate, misalign and make each subsequent more difficult?

Problem Solving

  • How often do your leaders try to solve complex problems with processes geared to “benign or simple problems”?
  • How often do leaders face complex or wicked problems?

Leading Learning

  • What expectations do we have of people to develop shared knowledge from similar situations?
  • How much effort have you put into helping people express being puzzled or misunderstood?
  • How well do they lead people on tackling problems and solutions by sharing understandings, resolving differences and producing agreed courses of action?
  • How well have leaders, especially senior leaders, consistently expressed their expectations of learning to all levels across the organization?

To Buy a Copy of Focusing Change To Win: CreateSpace Buy Button

 

 

 

To Buy a Copy of Focusing Change To Win:

Focusing Change To Win – How Effectively Are You Communicating Change?

Series Introduction

This is the seventh in the series of highlighting contributions from 1072 Business Leaders and Consultants from 80 countries in 19 Industry Sectors detailed in our book Focusing Change to Win. Each blog gives some of the key findings and a sample of useful tips. In this blog we are focusing on How Effectively Are You Communicating Change?   Here are the other book sections we are highlighting:

  1. Why is this book important?
  2. How is your “What” connected to your “Why”?
  3. Why do people resist change?
  4. Why bother measuring change?
  5. How can implementing change gain competitive advantage?
  6. Is your organization thriving or surviving?
  7. How effectively are you communicating change?
  8. How can you lead to thrive?

 

7. How Effectively Are You Communicating Change?  

The following is based on 684 contributors who chose to add comments on communicating change. Unsurprisingly, contributors see their people at the heart of any successful change process. They see gaining stakeholder commitment as a force multiplier of powerful change ambassadors. Essential to creating that commitment are leaders taking their people into their confidence with honesty and courage.

Surprisingly, however, our analysis also sheds light on some blind spots. Overall, contributors focus more on technique than systemic or strategic issues when communicating change. For example:

  •  They (Leaders) lack the ability to motivate or hold people accountable….they do a poor job at this…..lots of saying nothing….People are told, not asked. 

Change Communication Blind Spots

How do communicate change. Zone of Concern Chart

Real change requires authentic communication and dialogue across all organizational levels. Although, employee’s resistance and disagreement are unavoidable, contributors show how it can be managed through multiplexed and constant communication. They stress that this only happens when change communication is centered on establishing and retaining trusting relationships. If employees feel fairness, they will trust more and trust is the glue of success.

So, what role does communication play in reducing change mistrust and cynicism among employees? Frequently, it’s people’s sense of fairness. The communication timing, involvement and sequence impact their sense of justice.

Where’s the Requiring Environment?

Change-Requiring Environment

There seems little focus on improving alignment and change success. Issues like change management, communication, and change measurement were under 6% of contributors’ comments on communicating change.

Looking in more detail, a third of contributors said that they didn’t know of any change related communication or that their leaders don’t communicate enough.

For most contributors, real change is the outcome of authentic communication. They show how change can be managed through constant communication. Contributors often commented that trust in management was the only variable that significantly impacted change resistance.

However, comments on authentic communication and building trust seem to collide with those related to top down led change. Critical contributors point out that top down rests too often on leaders clinging to the belief that power, privilege and success lie in their core group. Whatever blend of top down and bottom up it is clear – one should be intentional and as one contributor said:

  • Being solid in the values you hold as a leader that needs clearly articulating and solidifying with your change management team before you start planning. 

Our contributors are clear. Lay the groundwork for successful change before trying to carry out the next change. This starts with putting the change management team together before a specific change is planned. Then develop a shared governing set of values and design the change measurement framework.

Implementing Effective Change Communication Processes – A Questionnaire 

This 38 question instrument was developed from 755 contributor comments on implementing an effective communication change process. It is designed to engage those involved in change management and leadership in selecting relevant questions and then reaching a consensus on improvement areas.

  • Analyzing Change Impacts
  • Set-up Change Program with Metrics
  • On-going Communication & Training

Action Points 6: Implementing an Effective Change-Communication Process

Based on your answers to the questionnaire above, use the following questions to develop your plan for developing effective change communication.

  • Have you established an explicit set of shared governing values?
  • How are you getting people ready for the inevitable change?
  • Have you engaged stakeholders and change agents?
  • Have you put the change-management team together?
  • How do plan to align the team’s values of change and their expectations of one another?
  • How are you going to improve leaders change communication skills?
  • Who is going to ensure that real change will be the outcome of authentic communication?
  • How are you going to ensure that all your people know and understand your change rationale?
  • How are you going to monitor employee’s sense of fairness and trust? (Remember: trust is the glue of success.)
  • How are you going to establish dialogue between groups and individuals, in often tense situations?
  • How are you going to establish and monitor your change’s requiring environment? Is there a set of aligned change expectations between leaders and each individual?

To buy a copy of Focusing Change To Win click: CreateSpace Buy Button

 

 

If you would like to contact Nick, please fill out the form below:

Focusing Change To Win – Is Your Organization Thriving or Just Surviving?

Series Introduction

This is the sixth in the series of highlighting contributions from 1072 Business Leaders and Consultants from 80 countries in 19 Industry Sectors detailed in our book Focusing Change to Win. Each blog gives some of the key findings and a sample of useful tips. In this blog we are focusing on Is Your Organization Thriving or Just Surviving? Here are the other book sections we are highlighting:

  1. Why is this book important?
  2. How is your “What” connected to your “Why”?
  3. Why do people resist change?
  4. Why bother measuring change?
  5. How can implementing change gain competitive advantage?
  6. Is your organization thriving or surviving?
  7. How effectively are you communicating change?
  8. How can you lead to thrive?

 

 

6. Is Your Organization Thriving or Just Surviving? 

This in-depth analysis shows the wide range of factors that go into developing the Thriving Organization. Our intent in being comprehensive is deliberate. We want leaders to select which questions are most appropriate to them.

Our reasoning is that there are no simple solutions or steps to follow. What we urge is open debate in leadership teams to reach a commitment to those few things which can make a difference between being ahead and just playing catch up.

Thriving or Surviving Questionnaire

Enabling Factors

There are 69 questions to select from divided into seven categories to help as you develop your plan for building a more vibrant and competitive organization.

  1.  Leadership in Thriving Organizations
  2. Change Management in Thriving Organizations
  3. Planning to Thrive 
  4. Agility to Thrive
  5. Thriving People
  6. Communicating to Thrive
  7. Learning to Thrive 

 

 

 

Action Points 5: Developing the Thriving Organization

Based on your answers to the questionnaire above, use the following questions to develop your plan for developing a more vibrant and competitive organization.

 

  1. Leadership in Thriving Organizations
  • What is the one thing you can do to improve your leaders focus for your current change?
  • What is your strategy for building leadership capacity and competence in the longer term?
  1. Change Management in Thriving Organizations
  • Which aspects of change management do you need to address now?
  • What are you going to do differently in managing change in the longer term?
  1. Planning to Thrive
  • How can you improve planning for change for the next time?
  1. Thriving People
  • In terms of the current change, what can you do to focus people on making this change successful?
  • What is your focus going to be in improving peoples change readiness and agility?
  1. Communicating to Thrive
  • Where do you need to focus in terms of improving communication?

To Buy a Copy of Focusing Change To Win: 

CreateSpace Buy Button

If you would like to contact Nick, please fill out the form below:

Focusing Change to Win Series – Why Bother Measuring Change?

Series Introduction

This is the forth in the series of highlighting contributions from 1072 Business Leaders and Consultants from 80 countries in 19 Industry Sectors detailed in our book Focusing Change to Win. Each blog gives some of the key findings and a sample of useful tips. In this blog we are focusing on The Why and What of Change. Here are the other book sections we are highlighting:

  1. Why is this book important?
  2. How is your “What” connected to your “Why”?
  3. Why do people resist change?
  4. Why bother measuring change?
  5. How can implementing change gain competitive advantage?
  6. Is your organization thriving or surviving?
  7. How effectively are you communicating change?
  8. How can you lead to thrive?

 

Why Bother Measuring Change?

Do you measure ChangeMost of our contributors do measure change, but 37% either don’t measure change or they don’t know if they do or feel measuring change is too difficult. So, here’s some evidence why this is worth struggling with. For example, learning is the most mentioned benefit of measuring change (27.1%). Yet, if this is so important then why the lack of focus on vehicles like coaching, mentoring and training to capitalize on this learning.[3]

Another striking disconnect is the low numbers of those who see benefits of measuring change’s impact on marketing and customers. This is curious, as our contributors’ most common reason for losing customers is not price but poor quality (92.2%), poor follow-up by sales people (76.5%) and making the wrong assumptions about customers (64.5%). After detailed analysis, it would seem that the relationship between change and competitive advantage is not as clearly visualized as one might think.

In addition, the use of employee metrics including personal performance, resistance to change, improvement to company culture and understanding our purpose, are low compared to satisfaction surveys. Most concerning is the lack of focus on individual behavioral change and tracking pay-related rewards. This is further evidence of little focus on accountability and establishing a requiring environment

Even when metrics are agreed upon, the next challenge is creating greater transparency so that they are used to create and sustain change momentum.

What Questions do Change Metrics Need to Answer?

Overall, there needs to be more focus on developing effective change metrics. The challenge is: How well do your change metrics accelerate learning, problem solving and decision making?

In Section 4, we distilled contributor questions on what they need change metrics to answer into a questionnaire. We ask readers to go through and rate their current metrics under three sections:

  •   Navigating during a Change 
  •   Reviewing a Change 
  •   Planning the Next Change 

Our contributors suggest establishing a change scorecard with their leadership team and key stakeholders. For example by:

  •      Agreeing on those questions which the team needs to answer
  •      Deciding what current metrics could be put to good use
  •      Assessing during the change process how well they cover the risks of losing customers through poor product or service quality and poor sales follow-up.

And finally……Asking how well your scorecard helps you sell this and subsequent changes?

 

Action Points 3: Developing More Effective Change

Metrics

 

Protocol

Three themes were referenced in contributor comments about change metrics and how to test their overall effectiveness.

  • How well do your change metrics accelerate learning, problem-solving, and decision-making?

Establish Your Change Scorecard

It is strongly suggested that you go through this process with your leadership team and key stakeholders. (See section 7 for more details.)

  • Review the table Contributor Questions.
  • Agree on those questions your team need to answer when you are doing the following:
  • Navigating a change
  • Reviewing a change
  • Planning the next change
    • What current metrics could be put to good use?
    • How well do they cover the risks of losing customers through poor-quality sales follow-up during the change process?
    • How well do they inform you that the organization is reducing assumptions about customers’ view of the change and how the change responds to their needs?
    • To what extent do your selected metrics allow you to preempt or least respond quickly to competitors
    • How well do these metrics allow you to gauge and track employee stress around the change?
    • To what extent will your metrics allow you to respond quickly and effectively to employee stress before it hardens their change resistance?

To Buy a Copy of Focusing Change To Win: CreateSpace Buy Button

If you would like to contact Nick, please fill out the form below:

Focusing Change to Win Series – Why do people resist change?

Series Introduction

This is the third in the series of highlighting contributions from 1072 Business Leaders and Consultants from 80 countries in 19 Industry Sectors detailed in our book Focusing Change to Win. Each blog gives some of the key findings and a sample of useful tips. In this blog we are focusing on Why Do People Resist Change. Here are the other book sections we are highlighting:

  1. Why is this book important?
  2. How is your “What” connected to your “Why”?
  3. Why do people resist change?
  4. Why bother measuring change?
  5. How can implementing change gain competitive advantage?
  6. Is your organization thriving or surviving?
  7. How effectively are you communicating change?
  8. How can you lead to thrive?

3. Why Do People Resist Change

Here’s the reality, Leaders need employee support and trust if their change is going to stand any chance of success. Our contributors underscore this.  If people are cynical about a change, pessimism will set in, and failure is assured. Our contributors show that there are no simple remedies, no sound bites or grizzly 7 step plans. Yet, at its core there are fundamental values that, if believed in, will offer a sound basis for planning and executing successful change. Change failures have left their mark on our contributors over the last eight years. Through their eyes, resistance is a brownfield site where change is synonymous with downsizing, doing more for less, and treating people poorly.

Accelerated change demands more of everyone. Such change has major consequences for employees. Accelerated change failure creates cultural toxicity. Crucially, leaders need to separate the symptoms of change resistance from the stress that causes it. If they don’t, they are just like bad sales people trying to overcome objections and not realizing 60% of those objections are of the salesperson’s own creation. These contributors, they are saying that change resistance is natural, but you don’t need to make it more difficult if you do some things profoundly well.  The chart below gives a sense of the avoidable.

Change Resistance Factors

Change Resistance Factors

Once you recognize that Change Resistance causes stress then you can be more effective in reducing it. Our contributors say that, if leaders create clear and consistent frameworks, you help most people make informed decisions about committing to a change or not. Here’s what our contributors are saying:

  • Align Expectations between leaders and people
  • Set Clear Direction: Leaders clarify their change’s What, Why, How and WIIFMs (What’s In It For Me) for different groups and people.
  • Develop Accountabilities: by developing the rewards and consequences that assure expectations of both leaders and their people are met.

These are sound practices for reducing and managing people’s stress, but only if leaders realize the importance of Walking Their Own Talk.

Action Points: Managing Change Stress and Resistance

All these contributors are saying that change resistance is natural, but you don’t need to make it that difficult if you do some things profoundly well.

This starts with recognizing that change resistance is caused by stress. So why not treat the cause and not the symptom? Stress is natural and good if managed. Stress is reduced if leaders create clear and consistent frameworks that help people make informed decisions about committing to a change or not. Here’s how we interpret what our contributors are saying

Clarifying the Direction:
Leaders clarify their change’s what, why, how, and WIIFMs¹ for different groups and individuals. What does this mean for me? This leads to aligning expectations.

Aligning Expectations:
This is a process flow in two directions between leaders and each individual.

Developing Accountabilities:
This step develops the rewards and consequences through performance measurement, management, and rewards that ensure expectations of both leaders and their people are met.

 

To buy a copy of Focusing Change To Win click: CreateSpace Buy Button

If you would like to contact Nick, please fill out the form below:

Focusing Change To Win Series: How is your “What” connected to your “Why”? – Setting-Up Change For Success.

 Series Introduction

This is the second in the series of highlighting contributions from 1072 Business Leaders and Consultants from 80 countries in 19 Industry Sectors detailed in our book Focusing Change to Win. Each blog gives some of the key findings and a sample of useful tips. In this blog we are focusing on The Why and What of Change. Here are the other book sections we are highlighting:

  1. Why is this book important?
  2. How is your “What” connected to your “Why”?
  3. Why do people resist change?
  4. Why bother measuring change?
  5. How can implementing change gain competitive advantage?
  6. Is your organization thriving or surviving?
  7. How effectively are you communicating change?
  8. How can you lead to thrive?

 

 

How is your “What” connected to your “Why”?

We take an in-depth look at how our contributors improve their chances of thriving, by communicating in ways that build trust and engage people. For these contributors, communication must constantly focus on the Why of Change & What is Expected and what the change is not about. This is the Change Expectations Framework. It engages deeper understanding and helps everyone manage stress more effectively.
Note: You may think everyone does these three steps, you are probably wrong at least 70% of the time according to studies over the last 10 years. Here’s why it is even more important today. Most contributors (89%) say that their organizations change at least every 12 mths . These changes are driven by 3-4 simultaneous reasons for change . All these changes should have three things in common. What you expect people to:

  • Stop doing, (so that they can start doing new things)
  • Start doing, and
  • Continue doing

How often does your organization initiate change

Yet, this survey’s findings show that contributors rarely mention all three in the same contribution. Why is this important? It creates increased stress and potentially change resistance. It works like this.
Assuming we are always managing change with limited resources like people, money, technology and time, leaders have to manage the tension between these three elements of stop, start and continue. Then, after deciding the commercial need for change, leaders need the Emotional Intelligence to identify which groups and individuals are likely to experience unhealthy stress and resistance.
This underscores the need for leadership consensus on why are we changing. For many contributors, leader inconsistency fuels people’s natural resistance . The ever-increasing rate of change demands that leaders give clear and compelling reasons for employees to overcome their feelings of here we go again . Unfortunately, we conclude that too many leaders either ignore, or are unaware that change will be stressful for their peers and employees.

Contributors readily see the need for change to adapt, survive or improve. The world’s ever-increasing pace demands that leaders give clear and compelling reasons for employees to overcome their feelings of here we go again. That response begs the question: What can leaders do about this condition. What follows are some thoughts.
All those implementing change know in advance, to some extent, that a change will be stressful and that not everyone will be willing to engage. For example, people often work well under certain stress to increase productivity. But, under other circumstances, they are surprised at the stress that another aspect of change can induce. So, stress can be negative, positive or neutral. For example, passing in an examination can be just stressful as failing. The problem occurs when people are under excessive or prolonged stress – Unhealthy Stress. The challenge for change leaders is that stress is unique and personal. A situation may be stressful for someone, but the same situation may be challenging for others.

Action Points: Reducing Employees Stress to Manage Change Resistance

Most contributor responses indicate that their organizations change anywhere from daily to annually. These changes are often unique to the organization, the triggers for change, and how change is managed. Yet all change has three things in common.

The Three Common Elements of All Change

Defining your own change and how it is managed starts with the following:

  • Identifying what you expect people to stop doing, so that they can start doing new things
  • Specifying what you expect people to start doing
  • Confirming what you want people to continue doing, while continuing to coordinate and keep the organization running.

Focus on communicating constantly the why of change and what is expected for your change to be effective and communicate what the change is not about. This is the change expectations framework, which engages deeper understanding and helps everyone manage stress more effectively

To buy a copy of Focusing Change To Win click: 

CreateSpace Buy Button

If you would like to contact Nick, please fill out the form below:

 

Tracking Expectations to Avoid IT Project Failure

(Abstract from Take Control of Your Project – Using Expectation Alignment to Avoid IT Project Failure by Terry Merriman, PCO Associates LLC)

Whether large or small, IT projects are complex change events. They need cross-functional collaboration between two or more departments or teams. Their success or failure reverberates throughout the organization and often impacts customers. Countless studies and papers on reasons for IT Project Failure cite two critical factors:

  • Poor interpersonal communications
  • Lack of professional project management

Numerous studies have shown that up to 70%  of IT projects fail. Over 20 years, Terry Merriman  and the other IT Project Failurecontributors to the White Paper – Using Expectation Alignment to Avoid IT Project Failure continue to uncover the usual cast of suspects like:

  • Customer requirements not being adequately defined
  • Customer requirements kept changing
  • Acceptance testing was slim to non-existent

These failure statistics are fully in line with the findings of the survey of 1072 business leaders and consultants summarized in my book Focusing Change to Win which I wrote with Kelly Nwosu.

How can that happen with professionals on both sides of the design effort? Weren’t they in the same meetings? What happened to the agreed requirements? testing regimens? and change request process?

Of course, they did all those things. What they didn’t realize is what they believed they understood of each other was at best misaligned. The IT professionals and the business professionals each assumed that the other understood the precise meaning with each communication; each assumed specific activities were part of the other person’s normal routine in a development project. So, projects failed to achieve the desired results due to::

  • Expectations not being made specific to the project or explicit to each other
  • Tasks not done as expected
  • Delivered Functionality did not meet expectations
  • Requirements weren’t met

If you are interested in having the authors speaking to your organization fill out this form.

Continue reading

Why do people resist change? Leadership Survey Findings (1072 managers, 510 CEOs, 80 countries)

Here’s the first findings from research conducted jointly with New Catalyst.(http://changeisessential.com)

Click Video link to view Nick Anderson position the upcoming publication of the full research report – Stategies for Managing Change and Winning in Todays Competitive Environment

Since change management came into fashion, a litany of failure has left its mark and our respondent’s echo what many have gone through in the last 8 years. It seems through their eyes, resistance has to be viewed as a “brown field” site. Gone is the naiveté of “a job for life” and an enduring contract between leaders and other stakeholders. Now, change is synonymous with downsizing, doing more for less, etc. For these respondents, they paint a picture of failed change, broken trust, fractured communication and poor leadership. We summarize their comments into the following:

  • Cultural Toxicity of Failed Change
  • “If people don’t trust you, what change do you stand?”
  • “People can’t be bothered”
  • “What’s in it for me?”
  •  “Not knowing the purpose of it all” – a litany of communication failure
  • Poor Leadership embeds and accelerates resistance

Continue reading

Getting the Best out of the Matrix

Introduction

For 40 Years few have challenged Matrix Management’s viability. Most writers remain convinced that a matrix approach is superior to a hierarchy, but why hasn’t it been more successful? This blog looks at pointing the reader to answer:

How do ensure we get the promised rewards of the Matrix?

First,  a definition for SHRM

In a matrix structure, an employee reports to two managers who are jointly responsible for the employee’s performance. Typically, one works in an administrative function, such as finance, HR, information technology, sales or marketing, and the other works in a business unit related to a product, service, customer or geography.

The matrix model is a network of interfaces between teams and the functional elements of an organization. As its simplest it is:

 think horizontal – think vertical – think interface.

Here are some of the challenges facing those thinking of improving or moving to a matrix based organization.

Continue reading

Vision: The Guidance System for Partnering

Introduction

Developing successful partnerships can only be accomplished if there is a strong and shared sense of vision.  It is the cornerstone, and launching point for successful partnering efforts.

Visioning in a partnership if different form other uses of the word.  It is much more than a defined set of shared goals and aspirations.  It exists to offer a tangible guidance system  which provides direction to both parties and helps them carry out their larger goals.  Such a system enables partnerships to overcome obstacles and achieve results.  When they lack vision they tend to drift around, or fall apart.

Continue reading

Complexity, the New Normal 2: Leading to the Essence

Listen to the Radio Program – 15mins

In my last blog I introduced my new leadership series – Complexity the New Normal.

It’s time we had a debate about how we develop rewarding working relationships today. (Rewarding not just productive).  It is the competitive core – energizing people and harnessing technologies better than anyone else.

The ultimate standard for such rewarding relationships is a leader’s ability to sustain superior results over an extended period.  The debate should focus three

The Gordian Knot

questions:

  • What does it mean to lead?
  • What does it mean to follow?
  • When do you choose one from another?

Why is this debate needed for us to climb out of this recession?

People have lost trust. Many business leaders, too many unfortunately,  are seen as self-serving and subservient to shareholders.

What happened? “Org Chart Thinking” increasingly doesn’t work. Knowledge workers respond to learning not “command & control”. Plus, young people don’t want to wait in line to lead. Most important, people are searching for genuine satisfaction and meaning. For example, “restoring people to full life and health.” Medtronic.

Continue reading

Ensuring Oilsands Project Success – Whitepaper

Authors: Brant Sangster, IMC (former Sr. VP Oilsands Petro Canada),Dr. Paul Clark, IMC (former CEO Nova Chemicals Technology, Board Member NRC, CCEMC),Dr. George Jergeas, Dept of Civil Engineering, University of Calgary, Nick Anderson, Senior Partner, PDS Group, Editor: Rolf Wenzel, IMC, Director Business Planning

Overview

Mobilizing armies of skilled labour from diverse locations and cultures, moving large equipment into remote locations in harsh climatic conditions and managing to budgets while costs are escalating make oilsands projects among the most challenging ever undertaken. Perhaps the most critical success factor  in managing such complex projects is establishing and developing productive relationships. This key factor is very difficult to measure yet is cited repeatedly as the number one reason for project failure. Consistently,  project  managers’  expectations  of,  colleagues,  teams,  subcontractors,  workers  and project  partners  are  substantially  different  from  what  they  actually  think  is  expected  of  them.    Such misalignments result in expected tasks not being completed in the way required for project success, tasks  being  completed  in  a  sub-optimal  sequence  or  excessive  time  invested  on  “low  return”  tasks. These  misalignments  cascade  into  scheduling  conflicts,  delays,  cost  overruns,  personnel  turnover, increased stress, safety and legal issues.
The take-away: New methods have been developed for the gathering and analysing of expectations from both the expectation originator’s and expectation receiver’s point of view. This enables the diagnosis of misalignments critical to project success, and facilitates the timely conversations required to align expectations and to keep projects on track before they become critical variables. Resource and competency gaps are exposed  and addressed. High achieving managers can be identified. A culture of communication, alignment and accountability can be measured and developed.

Listen to an introduction by Nick Anderson

CONTENTS

1.0 Oilsands Projects – What Makes Them Unique
2.0 Why do Projects “Fail”?
3.0 Expectation Alignment for More Effective Project Planning and Execution
4.0  Case Study – Large Construction Project
5.0 Project Teams as a Neural Network – The Foundation for a Culture of Alignment and Accountability
6.0 The ROI for Oilsands Projects

1.0 Oilsands Projects – What Makes Them Unique

The Opportunity

With over 170 billion barrels of recoverable reserves, the Alberta oilsands represent a unique opportunity for North America to achieve a greater degree of energy independence in a low risk operating  regime.    Total  oil  supply  from  Western  Canada  is  expected  to  grow  from 2.4 million barrels  per day  in 2005  to  over  3.6  million barrels  per day  (bbl/day)  in 2015,  an increase of 50%.  This requires an investment of between $94 and $125 billion.1 While  some  bitumen  reserves  are  accessible  using surface mining  techniques,  most of the recoverable reserves  are  deeper  and  accessed  using  Steam Assisted  Gravity  Drainage  (SAGD)  technology  that requires far less surface land disturbance. While not without  reservoir  risks,  SAGD  enables  operators  to expand  production  more  gradually  than  mining operations because the minimum economic size of a SAGD  project  can  be  scaled  down,  perhaps  even below 10,000 bbl/day.

 

Suncor Oilsands Plant

The Challenges
Size – These large projects are large, with capital budgets currently ranging from $250 million to $7  billion,  or  US$25,000  to  US$70,000  per  flowing  barrel.    Projects facilities range  in  size from10,000  bbl/day  to  over  100,000  bbl/day.      Every day  of  schedule  slippage  could  cost between $1 million and $10 million in lost revenue. Complexity  –  These  projects  are  characterized by  a  large diversity  of functional  areas  each with  separate  project  managers, budgets  and  schedules.    There  are  many  project  elements, requiring  a  long  build  schedule  with  the  possibility  of  multiple  EPCs  and  many  and  diverse suppliers and contractors.
For example: Designing and constructing a $3-billion oilsands project can involve the following:
(Why Cost and Schedule Overruns on Mega Oil Sands Projects?, George F. Jergeas, Ph.D., P.E.1; and Janaka
Ruwanpura, Ph.D., PQS2; Practice Periodical on Structural Design and Construction, ASCE / February 2010)

Engineering effort:

  • 3.5 million work hours at a cost of $100/h.
  • 40–50,000 design drawings.
  • 10–20,000 vendor and shop drawings.

Construction effort:

  • Typically runs at 5,000 work hours for each million dollars invested, i.e., 10–15 million man-hours at $85–$100 per hour for a $3 billion project..
  • Supported by 500–800 staff personnel.
  • Labor force of 10,000 workers with a turnover of 30,000 people. (Even using the lowest North American average estimates of replacement costs for $8.00/hr employees of $3,500, this equals a cost of $105 million!)
  • Organize order, store, and retrieve 80,000,000 material items.
Procurement and transport logistics challenges to a remote location can be  exacerbated by long lead  times  on  key  equipment,  increasing  the  risk  of  scheduling  conflicts  and  slippage. Personnel training, scheduling and logistics are complex and include continuous flights bringing workers in from Eastern Canada and elsewhere.   There are complicated communications lines among the functional areas, contractors, locals business and governments.  The  involvement  of  multiple  equity  partners  with  substantial  financial  interests  adds  another level of accountability and can be a bottleneck in decision making.  Partner communications can add significant project overhead and makes it more difficult to respond to change, or innovations arising mid-project that could benefit the project.
Climate – Harsh climatic conditions affect productivity, health and safety, and project costs, especially for workers unused to working in these conditions. Health & Safety – In addition to working in a harsh climatic environment, cultural and language barriers with foreign workers can affect safety.  High turnover and inexperienced workers pose dditional safety risks.
Labour – Availability and Productivity – As projects begin to ramp up again, the risk of shortages of experienced project managers and skilled labour may again increase.  Personnel retention was a major issue during the construction boom up to 2008.  The cost effective integration of aboriginal  contractors  requires  special  attention.    The  balance  between  union  and  non-union labour must be planned and managed.   Housing and the cost of living are expensive in the Ft. McMurray area. Workforce scheduling and logistics are a major challenge and there has been  lack of  cooperation among operators  in this area,  largely based on concerns around  losing personnel to other projects.
Environmental – Oilsands projects have become the centre of media attention in the past few years.  Thus, even the design and construction phases of these projects must demonstrate a proactive stance, rather than just compliance.
“In summary, future oil sands projects are going to be more complex due to both a set of external and internal factors interacting dynamically with each  other.  This  means  that  the  industry’s  ability  to  manage  socio-political, economic and technological fluctuations over a project’s life will be  critical.  This  is  not  an  advocacy  for  throwing  out  the  tried  and  true project management disciplines but learning how to use them in far more fluid circumstances”
(Richard Westney, Westney Consulting Group)

2.0 Why do Projects “Fail”?

“Insanity: doing the same thing over and over again and expecting different results”
Albert Einstein

The State of Oilsands Projects

During the 2005 to 2008 period, oilsands  projects were notoriously over budget and behind  schedule.   With  the  current  ramp  up  of  projects,  can  we  face  similar  cost escalations and labour shortages  in the coming years?
Randy Ollenberger, (BMO Nesbitt Burns Inc.), points to the expansion of  the Athabasca Oil Sands Project as it was the biggest project to continue construction throughout the entire market crash. But  rather  than  costs falling, they  continued to  rise.  If  there were great  savings to be had, they should have captured them. And clearly they haven’t,” he said.
Steve Laut, President, Canadian Natural Resources (05/21/10) fears that cost escalations may be an unavoidable outcome of the rush to get back into oil sands.
“There will probably come a point in time that people feel confident oil prices aren’t  going  to  fall  to  $30  [U.S.]  again  and  everyone  will  have  their engineering done more or less at the same time. So there’s potential that you could get some overlap in projects. Canadian Natural is already struggling with the lingering effects of the last boom, when triple-digit oil prices propelled a mad building scramble. That has resulted in operational problems at the first phase of its Horizon oil sands project, which Mr. Laut admitted has been “bumpy.”
A recent Booz Allen Hamilton report, “Capital Project Execution in the Oil & Gas Industry”, indicated that the majority of energy industry executives:
  • Are dissatisfied with project performance (40% of capital projects overrun) his level of dissatisfaction is the highest ever.
  • Agree  that  poor  project  performance  is  not  acceptable  when  the  market  expects predictability and strong returns.
  • Accept that they cannot afford to miscalculate project risks, yet they do not have a good grasp as to how to manage them.
According to Richard Westney, Westney Consulting Group,
“Everyone in the industry is aware of the major cost overruns and schedule  delays  associated  with  major  projects  today.  An  often overlooked  fact  is  that  these  overruns  are  often  announced  when projects  are  well  into  construction—long  past  sanction  and  at  a  time when traditional project risks have (or should have) been mitigated. How is this possible when conventional wisdom suggests that all project risks should  have  been  understood  and  under  control  by  this  time? Conventional project risk management is based on two assumptions:
• Good “front-end loading” ensures a high level of confidence in the estimate of time and cost at sanction.
• Project risks decrease with time and progress.”
Since it is not uncommon for projects with good front-end loading to experience major  overruns  well  after  sanction,  we  must  ask,  “What  is  missing  from  the conventional approach?”

Symptoms and Causes

The symptoms of “project failures” or significant negative variance from plan are obviously manifested  in  easily  measurable  parameters  such  as  budget  overruns,  lateness  and  safety issues. However, problems can start long before these measurements of tactical activity are possible. Jergeas  et  al5  point  out  that  the  trend  towards  project fast  tracking  can  result  in  appropriate planning time being traded for overly ambitious construction schedules which can result in more overtime  and  higher  materials  and  equipment  expenses.  In  addition,  inadequate  time  spent planning  in  areas  of  risk  management,  project  control,  communications,  organization, contracting, design, procurement, site layouts, utilities, commissioning and external stakeholder  management, among others, can result in a fundamentally misaligned project strategy. Conversation  with  oilsands  operators  and  a  review  of  the  2004  multi-sector  study  by PricewaterhouseCoopers  (PWC),  “Boosting  Business  Performance  through  Programme  and Why Cost and Schedule Overruns on Mega Oil Sands Projects?, George F. Jergeas, Ph.D., P.E.1; and Janaka Ruwanpura, Ph.D., PQS2; Practice Periodical on Structural Design and Construction, ASCE / February 2010
Project Management”,  among  the  top  reasons  cited  for  “project  failures”  were  issues  and misalignments in the following areas:
  • Late scope changes

    Nearly but Not Quite

  • Change in environment
  • Insufficient resources / Poor support
  • Poor communications
  • Poor project processes and controls
  • Poorly developed teams
  • Poor partnering strategies
  • Poor contracting strategies
  • Team turnover
  • Inadequate definition of stakeholders
Late Scope Changes – To what extent are scope changes the result of inadequate communication of  expectations  between  owner  and  EPC,  or  EPC  and  contractors?    At  the earliest stages of the project, inadequate specifications can be a root cause.  The owner may expect the EPC to have conducted a thorough review of specifications prior to start of drafting. Was this expectation communicated and detailed evidence of completion requested?   The later in the project these sorts of changes occur, the more expensive they become. Attempts to appease, accommodate or just to get things done means change orders or scope changes  are  too  readily  accepted  without  sufficient  impact  analysis.  This  situation  is  often compounded by having no firm and set date beyond which no further changes are accepted.   It is  reminiscent  of  Mr.  Creosote,  a  fictional  character  in  Monty  Python’s  the  Meaning  of  Life. Creosote  is  an  impossibly  obese  man  who  is  served  an  enormous  amount  of  food  in  a restaurant. After being persuaded to eat one more mint, he explodes in a very graphic way. The key error is the consequent layering of changes creates an almost blinkered approach of approvals or rejections while losing sight of bigger, end repercussions.
Changes in EnvironmentIt may be beneficial to ask the question, “How can we improve our  ability  to respond to  environmental  and other  changes”?   To  what  extent  could  improved communication of expectations mitigate these issues?  Have the owner and EPC clearly relayed their expectations of rapid communications from contractors and suppliers when circumstances change?    Does  the  project  have  a  change  management  plan  with  specific  communication protocols for managing crises?
Insufficient Resources  /  Poor  Support –  Supply  chain  logistics  are  both  critical  yet vulnerable aspect of oilsands project execution. It relies heavily on proper communication and tracking agreed and unmet expectations.    Shift scheduling and logistics optimization offer large opportunities for efficiency gains.  To what extent are the expectations of efficient and proactive communications  relayed  to  all  levels  of  the  project  structure?    What  mechanisms  exist  to facilitate this and ensure monitoring of logistics operations? Especially  lacking  are  those  inter-professional  expectations  which  don’t  really  specify  what  is being  agreed  to.  The  act  of  agreeing on  an  expectation  is  too  easily  accepted.  The problem emerges when the expectation’s Receiver doesn’t deliver what was expected by its Originator. The problems often lies when the Originator doesn’t ask the Receiver to state what evidence they think meets the given expectation. This  situation  is  often  compounded  under  stressful  and  changing  conditions  where  the ramifications of meeting the new expectation are not fully considered on existing commitments.
Poor Communications – The number of possible lines of communication in a project can be expressed as n2 – n, where “n” is the number of people assigned to the project.  Thus a 100 person project would have 9,900 possible communication links.   Regardless of matrix, project or siloed command structures, there are still many cross functional and contractor expectations that are not surfaced or managed and that impact project execution. These lateral links are so numerous and not so obvious that important connections for timely and  accurate  communications  are  missed.  Many  would  say  with  all  the  technology  now available, all those involved have access to what everyone else is doing or challenged by. The reality, as one Project Manager expected of a design engineer: “If you find out you can’t make your deadline, don’t email me – pick up the @#$% phone…” Communications technology has become a two- edged sword – efficient yet overwhelming. While  many  respondents  cited  poor  communication  a  significant  problem,  to  what  extent  are poor communications or processes a root cause of the other cited project failures?  Following are quotations gathered from participants in various projects:
1. “We could be better at identifying problems and their solutions before they actually occur.  We are too reactive and this slows us down”
2. “The way we allocate resources and feedback on their (subcontractors’) performance compounds problems in managing projects”
3. “People get so absorbed in what they are doing that Key Stakeholders are not actively involved. This has led to tension between them and the project team”
4. “We are reactive and respond too quickly to changes to understand the implications and impacts on other elements and groups”
5. “We don’t reuse what has been done before – “Reinventing the Wheel” is costly and takes time”
6. “Measuring the impact of what we do is too subjective and lessens our ability to stay within  budget”
7. ‘Cost overruns and missed milestones are too common and compounded by finger pointing”.
Some of which are directly attributable to expectation gaps:

Project Team Dysfunctions

Dysfunction #1: Absence of Trust
This occurs when team members are unsure what others really expect of them as opposed to what their company has committed to legally.
Dysfunction #2: Fear of Conflict
Teams that lacking trust are incapable of engaging in unfiltered, passionate debate about  key  issues.  This  causes  situations  where  team  conflict  can  easily  turn  into personal, veiled discussions and a retreat to pure self interest.
Dysfunction #3: Lack of Commitment
Without conflict, it is difficult for team members to commit to decisions, creating an environment  where  ambiguity  is  comfortable.  Lack  of  direction  and  commitment  can make project partners and teams disgruntled, fall into formal communication and lack of responsiveness.
Dysfunction #4: Avoidance of Accountability
When teams don’t commit to a clear plan of action, even the most focused and driven individuals  hesitate  to  call  their  peers  on  actions  and  behaviors  that  may  seem counterproductive early enough to correct a situation for the overall good of the project.
Dysfunction #5: Inattention to Results
Project team members naturally tend to put their own needs (ego, career development, recognition, etc.) ahead of the collective goals of the team when individuals aren’t held accountable. If a team has lost sight of the need for achievement, the project ultimately suffers.
The above dysfunctions are rooted in problems with aligning expectations.
(Adapted from Patrick Lencioni “Five Dysfunctions of a Team”)
“Expectation Gaps are like pot holes, the more you leave them the deeper they get. The impact of misalignment leads to projects overruns.” (Nick Anderson, PDS Group LTD)
Poor Project Process and Controls Execution – It is the daily execution using project process  controls  that  makes  the  difference.  Senior  management  can  be forgiven  for  thinking that if processes and controls are in place that they are being used diligently.   However, the early  clear  communication  of  specific  expectations  around  development  and  use  of  these systems is foundational to success. Increased complexity and changing dynamics in running oilsands projects means the industry has to pay more attention to the costs of misalignment.
Poorly Developed Teams – While projects of this size and complexity usually command the best available personnel, Alberta companies often have large experience gaps between senior managers and junior managers.   Bridging these competency gaps requires clear expectations communication  of  responsibility  not  just  tasks.    Then,  crucially,  conversations  must  align expectation originators with the expectation receivers, including deliverables. Only then can the originator effectively rate the receiver’s competence and performance.
Poor Partnering Strategies – Staffing for inter-partner communications, that add millions of dollars to the cost of a project, buffer the project teams from regular and ad hoc reporting and information requests.  The less work that is done up front in explicitly defining expectations in geographically remote and culturally different partners, the more cost in communications.  Far more  important  however  are  the  potential  for  delays  in  the  project  where  unexpected circumstances  need decisions  requiring  consent  from  partners.        These  may be  changes  in project  circumstances  or  opportunities  for  applying  improvements  or  innovation  with  potential positive economic impact on the project.
Poor Contracting Strategies – Failure to document performance guarantees and risk sharing  obviously  undermines  contractual  relationships.  However,  on  site,  it  is  really  about avoiding ever to having to use them.   As many say, “if you have to get the contract out then we really are in trouble!”. Partnering starts to fail when specific expectations aren’t communicated, agreed,  discarded  or  are  unresolved  to  avoid  using  these  contractual  devices.      Successful partnering is founded on: ”Getting personal to  prevent ever getting contractual”.
Team Turnover – Poor communication and alignment of expectations often causes of turnover.    When  expectations  like  budgetary  discretion,  scheduling  flexibility  and  safety protocols are not only agreed but managed to, employees may not wish to stay and face the consequences. This will be a major factor again if the industry goes back to its practices of the last boom in Alberta. Apart from cost and experience and project knowledge “walking out the door” from the project managers risk losing well  established relationships  both  within  and  outside the  team.  They  then  hobble their replacements with no clear commented expectations to help new team members get up to peed with the right people.
Inadequate Stakeholder Engagement – Oilsands project stakeholders are diverse, typically  including  owners,  EPCs,  contractors,  suppliers,  logistics  providers,  regulators,  local communities, local businesses, aboriginal communities, environmental groups and others. It’s  natural for those  planning projects  to focus on  project execution.  Yet  how  often  has  their apparent disregard of some stakeholders led to delays, scope creep and cost overruns?  Here the illusion of efficiency fails to take into account those that need to be onside for the project’s success.    This  then  creates  a  corrosive  element  to  relationships  when  stakeholders  feel disregarded.  By  the  time  Project  Staff  realize  the  need  to  align  they  have  an  uphill  battle  to convince these parties of there inadvertent lack of alignment. The key concern is: How many of these stakeholders and project staff will then be involved on subsequent projects. Mutual suspicion built up from one project bleeds over to the next project.
Summary
In summary, planning, whether “fast track” or not, still requires a clear concise and communication  of  expectations  by  stakeholders  along  key  aspects  of  the  project strategy.   While  this  paves  the way  for  successful  project execution,  simply  allocating the resulting tasks does not ensure success. Without project   manager’s expectations being  understood  and  “bought  in  to”  by  the  engineering  or  construction  domains, improved performance will not occur.   Fast Tracking methods of strategic planning and construction  risks  getting  ahead  of  stakeholder’s  ability  to  measure,  manage  and facilitate communication. New methods of more effective communication and alignment of  critical  expectations  are  needed  to  cope  with  this  decade’s  accelerating  project dynamics.

3.0 Expectation  Alignment  for  More  Effective  Project Planning and Execution

You Can Only Manage What You Can Measure

Effective interpersonal communications is  a  recognized  cornerstone  of successful  project  management.    Why then  is  it  so  metric  and  data  starved? How  can  we  manage  what  we  cannot measure?
Many people who run projects will tell you:
“Building the thing is not difficult compared  to  managing  all  the  people involved”
So,
  • How do we develop measurable ways of working more effectively?
  • How do we assess people’s expectations  of  others  with  those  others have of them
  • How can we help people be more aligned and focused
  • How can we drive performance discussions  between  groups  and individuals  on  their  expectations  and assumptions that result in:
o Specifying clearer performance criteria against which individuals/groups will be measured
o Removing expectations that are non-value added and not strategically aligned
o Identifying significant issues to address for project advancement
o Creating an accountability framework

The AlEx™ Expectation Alignment Methodology

The AlEx™  Expectation  Alignment  methodology  is  a  key  driver  of  change  which  accelerates alignment  and  tracks  the  development  of  working  relationships.  Such  tracking  includes:
  • Distractions that impact work loads
  • Misaligned expectations which reduce flexibility, risk rework and cost overruns

    Human glue

  • Factors that reduce cross functional competitiveness
  • Misalignment with organizational principles and strategies
  • Productivity issues between managers and their staff
  • Quality of interpersonal communication
  • Integration of new team member
  • Performance tracking & management
  • Recruitment & talent management
The impact of this approach is:
  • Insurance against projects delays
  • Faster project execution
  • Better productivity
  • Improved employee retention
  • Attracting people who are naturally better aligned
Essentially these benefits accrue when all people understand:
  • What is expected of them
  • What they can expect from others
  • How well they are strategically aligned
  • How their performance is measured and compensated
  • What they can stop doing
  • What they need to focus on
  • What information and resources can be used to achieve their goals
  • How they are going to be supported and coached

How AlEx™ Works

Using the AlEx  Easy Entry™ web application, individuals  identify  their  expectations  of  others and what they think is expected of them. AlEx™  is  then  used  to  analyze  content,  quantity,  and quality of the Expectations generated. AlEx™ Cross-Hairs Alignment Tool™ provides targeted data pictures of groups and one-on-one relationships as shown on the right.
For  example,  the  relationship  between  Tom and Cliff  looks  aligned  if  you  only  look  at  Tom’s expectations of Cliff (13) and what Cliff thinks Tom expects him (12). But, Cliff’s expectations (22) & What Tom thinks Cliff expects of him (4) tells a different story. Users are then shown how to use their AlEx™ Cross-Hairs Alignment Tool™ to “rifle-in” on data  to  prioritize  which  alignment  meetings  are  really  needed.  Then  users  meet  and  decide which of their expectations are:
  • Discards
  • Unresolved
  • Agreed
This ability to “rifle-in” on key issues before they cause entrenched discord is much like “clash identification” in BIM (Building Information Modeling).
AlEx™ is the “human cousin to BIM”
Dick Ortega, President, Alternative Mechanical
Building Information Modeling (BIM) is the process of generating and managing building data during its life cycle[1]. Typically it uses three-dimensional, real-time, dynamic building modeling software to increase productivity in building design and construction.[2] The process produces the Building Information Model (also abbreviated BIM), which encompasses building geometry, spatial relationships, geographic information, and quantities and properties of building components.

AlEx™ Outputs

1. Distraction Index
The Distraction Index identifies which individuals  or groups are aligned or distracted from achieving strategic goals:

Closing the Distraction Gap

  • Aligned,  and  Doing  Things  that  are  Expected —  expectations  and  assumptions  of  these expectations are in balance.
  • Distracted,  and  Doing  Things  that  are  Not  Expected —  individuals  are  making  incorrect
  • assumptions about what others expect of them
  • Distracted and Expecting Things that are Not Done — expectations exceed assumptions of those expectations.
 

Designers & Owners Tension Ratings

2. Tension Ratings

Expectation originators rate each of their expectations on a scale from High (project critical) to
Low Tension if an expectation is not met. Tension rating filtering enables users to see how well they are aligned
in terms of stress and the importance others place on different areas of the construction process.
3. Cross-Hairs Communication Channel Analysis
Un-Channeled
In a construction project, groups are often expected to change who they communicate with and about  what.  If  for  example,  the  General  Contractor’s  Project  Executive  is  expected  to  work closely  with  the  Chief  Superintendent  to  adopt  Lean  Construction  practices  to  meet  Owner expectations and they d 

Misaligned Core Group

o not have any expectations of each other! Conversely, if the Design Engineers  now report directly  to  the newly appointed Owner’s  Engineer and  not  the  Owner’s Facilities Manager then you would not want to see people still having expectations of the GM.

4. Cross-Channeled
Medium levels of expectations are often needed between different professions and trades as the main construction phase begins. This is especially true in Design-Build Projects
Highly-Channeled
High levels of expectations are needed where people work in the same function or project, e.g. Owners and EPCs.
5. Dealing with Change
Changing project circumstances require timely responses. AlEx™ is a real time system that enables adaption of existing or creation of new expectations to handle change.  E-mail updates of  such  changes  can be automatically  broadcasted.   AlEx™  has  adjustable granularity,  i.e.  it can  deal  with  high  level  expectation  alignment  through  to  execution  level  task  alignment, depending on the changed circumstance.
6. How Does AlEx™ Integrate with MS Project™ and Other Project Management Systems?
AlEx™ acts as a project management “front end” to keep existing project reporting systems updated with not only task completion status, but also with changed expectations required by changing internal or external circumstances.   Thus expectation alignment can be maintained without having to change pre-existing reporting systems. The interface between AlEx™ and existing systems is done via scheduled batch file updates. Thus  even  if  the  project  “playing  field”  changes,  the  benefits  of  aligning  team  members  are realized  continuously  throughout  the  life  of  a  longer  project  using  existing  reporting  systems. Adding  AlEx™  can  make  existing  project  management  systems  more  than  just  dashboards, they can become navigation systems, to keep the project on course as circumstances change.

4.0 Case Study – Building Construction Project (See Case Study)

Symptoms
This large construction firm manages and constructs large projects around the world. Some of their most complex work is on hospital projects. In  this  case,  the  number  of  change
orders, RFI’s (Requests for Information) and building decisions awaiting government  regulatory  agency  approval had  pushed  a  $500  million  hospital project into crisis.
The owners and prime contractors were faced with escalating change orders brought on by a number of factors including drawing quality, owner groups changing their specifications and a series of contractual changes. Consequently, the overall contingency fund for a three hospital project was being depleted at an accelerated rate.
Relations between owners, engineering firms, architectural design professionals, subcontractors and the general contractor had become strained.
The leadership group representing the major players became increasingly concerned about the ineffectiveness of OAC meetings (Owner/Architect/Contractor), and the cost of having so many rofessionals/consultants on hand, all charging professional level hourly rates.
Diagnosis and Therapy
The AlEx™ Expectation Alignment methodology was employed with the following approach:
  • Facilitation of meetings with each of the main group’s leaders to elicit their perspective on the key issues and what they wanted to be better aligned on with other groups/individuals.
  • Development of consensus of six key issues or “components” on which all 7 groups (a total of 35 people from 17 companies) agreed would require alignment
  • Coaching of all these players in generating expectations for each of these components (within and between groups)
  • Providing analysis and feedback to the leadership team, isolating several key initiatives.
For example:
  • Aligning OAC representatives to focus on key initiatives in each of the three projects
  • Setting up structured coaching within owner, general contractor and architectural firms
  • Aligning the change order process across the three projects
  • Accelerating the decision to replace the incumbent architects and help integrate their replacement
  • Aligning three architectural firms on fostering better co-ordination and common design policies
Outcome
The leadership group recognized the following tangible benefits from applying the AlEx™  system:
  • Cost hemorrhaging was stopped.
  • The project was completed on schedule.
  • There was no post project litigation among the 17 organizations involved in project planning and execution.
Other intangible benefits noted by the client:
  • Created a more productive environment for all of our building Partners Reduced or eliminated conflicts of all kinds by improving the way we communicate with each other
  • Reduced schedule blocks and re-work, thereby maintaining the approved construction  schedule
  • L ed the way for our partners (Client, Design Team, Inspection Agencies, and Subcontractors) in conducting business in a fair, open, and trusting way as the means to eliminate profit erosion, conflicts, and claims
  • Utilized “Partnering” as the means to accomplish our initiatives In a “design-build” environment which included a government owner, we were able to resolve several major conflicts using AlEx™ to expose hidden and unspoken expectations in “real time.
  • Ongoing communications became much more interactive and without conflict.
  • Tools from our partnering sessions are long lasting were used by all parties almost daily to insure the success of each stake holder. A reduction in lost time and resources resolving “festered” conflicts, because most were resolved before they reached such a state.”

5.0 Project Teams as a Neural Network – The Foundation for a Culture of Alignment and Accountability The Project “Brain”

Consider each team member a neuron in a “Project Brain” and the lines of expectations with other team members as synaptic connections. A one  way  expectation  will  be  a  weak  synaptic connection

Project Synapses are essential to neuronal function: neurons are cells that are specialized to pass signals to individual target cells, and synapses are the means by which they do so.

until it is acknowledged and accepted by another neuron.The AlEx™ expectation alignment process facilitates  and  measures  the  creation  of aligned expectations  so  the  Project  Brain  grows  and learns to better able to handle change. Thus,  like  brain  plasticity  now  being  discovered  in  humans,  the  Project  Brain  will  adapt  to changing circumstances by discarding synaptic connections (fulfilled or dropped expectations) or making new connections (new or altered expectations).The Project Brain is effectively self-diagnosing, exposing the squandering of energy (on unnecessary tasks) or resource deficiencies (lack of materials, knowledge or support).  It can also regulate the release of hormones to stimulate action (tension ratings).

Tools Facilitating a New Project Execution Culture

We have seen how one of the most important aspects of project management, expectation alignment, can now be measured and managed.  However, a toolkit and system to enable this does  more  than  measure  and  manage,  it  promotes  a  culture  of  communication  and accountability. Aculture of accountability is fostered  by AlEx™ because it ensures team members gain a feeling of control over what is expected of them but also that their expectations of others are understood  and  evidence  of  task  completion  documented.      As  the  entire  AlEx™  process requires more effective communications, team members must incorporate it in their regular work activity.
Competency Development

Like any habit, coaching and repetition are key factors in adoption. Initially, facilitated expectation  alignment  sessions  are  combined  with  training  on  the  web  input  of  expectation parameters.    Periodic  monitoring  of  alignment  progress  then  helps  ensure  the  most  efficient adoption  of  this  methodology.      Corporate  internalization  of  the  system  is  accomplished  with relatively  simple  “train  the  trainer”  sessions  that  enable  provision  of  in-house  facilitation  and monitoring services. AlEx™ identifies  communications  weaknesses  among  managers,  where  coaching  may  be needed, thus strengthening the project team going forward.
Optimized Resource Allocation – Top Down and Bottom Up
For an improved accountability culture to take root, it must be not only top down and bottom up but  omni-directional.    It  takes  root  because  expectation  originators  are  accountable  to  the expectation  receivers  to  ensure  they  have  the  required  competencies  and  tools.  This  is  the neural connection that builds the Project Brain’s capacity because people explicitly know:
  • What leaders expect of them (typically 70% of leaders’ expectations are either not known or understood by those executing the project)8
  • What team members expect of their project leadership.

6.0 The ROI for Oilsands Projects

Sources of Payback

Adoption of any new process must have a return on investment. While Expectation Alignment has  been successfully  employed midstream  to  “projects  in  crisis”,  it’s  highest  ROI  is  realized when  used  in  real  time  to  diagnose  and  address  communications  weaknesses  and  enable proper project planning and execution. Reviewing our key sources of failure, we can now see where payback can be expected applying Expectation Alignment:
Project Planning – Early alignment of all stakeholder expectations avoids expensive surprises and delays. Alignment facilitates “faster track” planning while reducing the problems of rushing to “Get on with it”, then paying the price later in areas ranging from design, project control and procurement.
Minimized scope changes – The owners’ expectations of the EPC  to have conducted a thorough review of specifications can be conveyed in a very detailed manner using Expectation Alignment.  This can avoid delays due to RFIs and change orders on critical path items.  With delayed revenue costing millions of dollars per day, the investment in expectation alignment can payback in a single avoided change order.Expectation alignment can facilitate  efficient assessment and incorporation of innovation that may  have  a  significant  long  term  benefit  to  the  project  economics.    This  is  accomplished  by enabling faster alignment and decision making among multiple project partners.
Change in environment – Even with a change management plan in place, a methodical and efficient way to incorporate new and discard old project expectations can mitigate costs by:
  • Improving response time,
  • Discarding activities quickly
  • Refocusing project teams to the new realities
Resource and support issues- – Early definition of resource expectations all the way down the chain of command can avoid costly delays and expenditures.  Similarly, competency gaps
can be identified sooner by engaging in expectation alignment processes.
Improved communications – With numerous stakeholders involved in planning, financing, permitting, engineering, procurement, construction, commissioning and operation of an oilsands asset,  static  definitional  documents  such  a  project  charters  and  conventional  project management  tools  are  not  designed  to  manage  thousands  of  changing  expectations. successful  project  execution  rests  on  agreeing,  discarding  or  identifying  the  unresolved. Expectation alignment methods identify managers who are especially strong or weak at communicating with their teams.  Coaching or other remedial actions can thus be undertaken and the results monitored. Employing Expectation Alignment in materials supply chain and personnel scheduling / logistics stakeholders can have big paybacks in avoided scheduling problems. Improved  project  processes  and  controls  –  Expectation  Alignment’s  regular  and measurable  process  of  developing  and  agreeing  project  expectations  are  taken  to  a  level needed  for  a  given  project.    Unlike  project  reporting  which  can  often  identify  symptoms, Expectation  Alignment  tools  also  make  accountability  for  task  execution  highly  visible. Expectation Tension Ratings may also reveal important tasks that are not necessarily on the critical path but can have huge ramifications to project schedules or budgets.
  • Late scope changes
  • Change in environment
  • Insufficient resources / Poor support
  • Poor communications
  • Poor project processes and controls
  • Poorly developed teams
  • Poor partnering strategies
  • Poor contracting strategies
  • Team turnover
  • Inadequate definition of stakeholders
Stronger teams The Expectation Alignment process demands that Expectation Originators ensure  that  Expectation  Receivers  have  the  competency  and  resources to  complete  the required  tasks.      In  situations  where  senior  managers  are  working  with  junior  personnel, assumptions  are  often  made  on  their  level  of  process  knowledge  and  industry  practices. Expectation Alignment addresses these issues by facilitating the alignment conversations that reveal experience gaps early enough to develop people and avoid later termination.
Stronger partnering strategies – Early definition of equity partner expectations among all key project themes and issues can be achieved using expectation alignment.   This can reduce inter-company  communications  staffing  requirements,  but  most  importantly  accelerate partner decision making when circumstances change or opportunities arise.
Improved contracting strategies – Incorporating  subcontractors and  key suppliers  in the Expectation Alignment process often reveals owner expectations and other stakeholders are not captured  in  specifications  and  contracts,  yet  play  a  significant  part  in  them  being  effective. Diagnosing and addressing these issues avoids later conflicts and delays.
Retention of talent – Again consider the 5 key” Project Dysfunctions”. ( Absence of trust, fear of conflict, lack of commitment, avoidance of accountability and inattention to results). Getting teams  participating  in  facilitated  expectation  alignment  sessions  creates  an  objective assessment of  team  stressors  and progressively  builds  a  more robust and  productive  project team culture. Based  on  this  foundation,  Expectation  Alignment  becomes  an  effective  tool  to  getting  new people up to speed and address competency gaps before their credibility is damaged.
Better  stakeholder  engagement while  inclusion  of  all  stakeholders  is  an  obvious apparent  remedy  to  avoiding  later  project  problems,  the  explicit  definition  of  mutual expectations,  especially  of  external  stakeholders,  can  yield  big  paybacks.  For  example, proactively  establishing  a  local  community’s  expectations  before  major  decisions  are  taken builds inclusivity and provides a more objective basis with which to resolve later conflicts and political  changes.    Projects with  international  partners  can  address cultural and other barriers with explicit expectation alignment methodologies.
Summary
In summary, where delays are measured  in millions of dollars a day, improving  the  speed  and  agility  of  construction  has  been  the  “holy  grail”. This pursuit encourages putting in place more controls and systems which often  fail  to  adequately  cope  with  increasing  project  complexity  and dynamics.  Effective  decision  making  needs  the  marriage  of  authority  and accountability  on-site,  not  its  divorce  to  some  remote  decision  maker. Simple, methodical alignment and monitoring of expectations reinforces this marriage to yield very tangible savings in time and money.

Great, but how can this help me?

This is probably the  first thing on your mind after reading this Blog.   How about asking us?  The first call is free!  Just email me to set it up.  Don’t wait, get PDS working for you!. If our conversation leaves you needing more, we offer at a reasonable fee telephone and video coaching on change, alignment, and executive performance that improve the bottom line.  If that still doesn’t do it, we’ll work with you on a solution.

____________________________________________________

___________________________________________________________________________________________________

For Help in Getting Your People on the Same Page
Nick Anderson, Senior Partner, PDS Group LTD
Ray Plamondon, PDS Group (Western Canada)
Rolf Wenzel
Ian Murray & Company Ltd.

direct 403-875-3310  fax 403-444-2008
www.imcprojects.ca

Listen to the Radio Show of this blog

© Copyright All Rights Reserved, IMC & PDS Group LTD and Walk the Talk – A Blog for Agile Minds, [2010-2011]. Unauthorized use and/or duplication of this material without express and written permission from this blog’s author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to Nick Anderson, PDS Group LTD and Walk the Talk – A Blog for Agile Minds with appropriate and specific direction to the original content.


Aligning Expectations in Construction Projects

AlEx Crosshairs

Your Line of Sight to Successful Projects

Aligning Expectations in Construction Projects

Getting & Keeping People on the Same Page

Clarifying and improving performance contracts between critical relationships, such as:

  • Architects and their Design Engineers
  • General Contractors and their Sub-Contractors
  • Managers and Subordinates
  • Leadership Teams
  • Cross-functional groups

Groups have successfully used AlEx™ to:

  • Improve competitiveness
  • Deliver more customer-focused solutions
  • Deliver a building on-time, on-budget and no legal

issues

  • Accelerate and build partnerships
  • Integrate new Architects
  • Streamline Change Order & RFI Processes

Potential Benefits of the Eternal Triangle: Owner, Architectural Design Team & General Contractor

The Goal: a perfect building with proper design, highest quality, constructed on time and last but not least, built within budget.

 Introduction

What follows are three areas where AlEx can potentially help the “Eternal Triangle” of tension and mistrust that pervades many construction project relationships

1. Managing Conflict and Relationship Tension

2. Managing Complexity

3. Improving Building Performance

1.    Managing Conflict – Benefits of AlEx™

  1. Helps develop a healthy attitude to managing rather than hiding conflict.
  2. Reduces the distracting and destructive products from poorly handled conflict situations.
  3. Helps harness diverse views and experience in the project team for the good of the overall project and Owner.
  4. Helps handle change as the project progresses and manages the constant flow of information between Owners, consultants and contractors.
  5. 5. Addresses the tensions in managing the dynamic and transient nature of the project life cycle process.
  6. Recognizes that as work precedes the relative bargaining strengths of the parties are constantly adjusting. Standard approaches to contracting simply do not take this into account.
  7. Overcomes, the inflexibility inherent in standard building contracts. For example, one contract assumes that the design is complete at the time of bidding and that the contractor employs most of the resources that will be required for the project. The fact is, design is rarely 100 % complete at the time of bidding and contractors subcontract most of the work.
  8. Develops Project Teams while recognizing their different rules of engagement. AlEx™ recognizes and helps facilitate different project needs and rules of engagement, like:
  • Changing Owner demands
  • Rapid learning
  • Generating and maintaining effective interaction between team members so that they can exchange views and debate the consequences of their decisions in an open and honest forum.
  • Changing circumstances over the project’s life cycle.
  • Shifting relationship tensions between the major members of the project team.
  • Building trust for when things do not go as planned.

2. Managing Complexity – Benefits of AlEx™

1.    Designs in flexibility in management structure and style that is essential in dealing with complex and changing business environments.

2.    Deals with the reality that construction contracts are based upon industry-wide standards that often are hastily modified and executed during a hurried design and bidding process. AlEx™ picks up where the contracting process stops. Every project needs a legal contract and a guide to monument – AlEx™ is the formative process to get the contracting parties into alignment.

3.    AlEx™ helps harness conflict that causes the distress and low productivity associated with escalating conflict. AlEx™ helps to develop open, skillful discussion that is needed to turn differences into synergistic gains rather than squabbling losses.

4.    The use of AlEx™ helps project teams build Partnering, a process of building up long term business relationships that reduce the adversarial nature of construction. The expectations approach helps shift the emphasis from a contractual focus to a results orientated management focus.

5.    AlEx™ takes the heat out of how to convert business deals into good contracts which produce lasting positive relationships.

6.    Helps develop the close working relationships needed between all designers and contractors in order to produce an integrated building in which all building services, structural and building elements are fully planned, systematically organized and combined, and brought to fruition as required by an Owner. It really produces teams that actually communicate effectively with each other.

7.    Helps develop the processes needed to cope with the growing complexity of design and Owner needs, e.g. as hospital buildings grow in size and complexity, building services also tend to be more sophisticated and difficult to manage from design to certificate of occupancy.

8.    Helps develop coordination to ensure that services and other building elements are properly planned, managed and coordinated.

9.    Develops protocols for coordinating multi-head Owner, changes of design, conditions of engagement of designers and contractors, division of design responsibilities, allocation of risks, early incorporation of specialty contractors/consultants, forms of contract and quality of design and construction management.  AlEx™ can also have a positive effect on coordination of building services within the General Contractors office.

10. Examines ways in which Owners and various designers, contractors and equipment suppliers can work together as a team in line with the projects procurement path or strategy (The whole process of creation, communication, response and integration in    the context of the project can be defined as procurement).

11. Helps develop Procurement Strategies by guiding decisions early in the project influencing risk allocation, design strategy and consultant/contractor hiring. This ensures that throughout the project the following are all consistent with the selected procurement route:

  • Roles and relationships
  • Project management approach,
  • Communication channels
  • Information systems,
  • Forms of contracts, and
  • Overall management of the project organization

3.    Improving Building Performance – Potential Benefits of AlEx™

1.      Identification of problems and their solutions before they actually occur. This is a proactive approach toward building solutions to performance issues.

2.    Improved space utilization and feedback on building performance.

3.    Improved attitude of building owner through active involvement in the evaluation process.

4.    Understanding of the performance implications of changes dictated by budget cuts and scope changes, add-ons, contract extensions, and government intervention.

5.    Built-in capability for facility adaptation to organizational change and growth over time, including

  • Recycling of facilities into new uses
  • Significant cost savings in the building process and throughout the building life cycle.
  • Accountability for building performance by design professionals and owners.
  • Long-term improvements in building performance:
  • Improved measurement of building performance through quantification.
  1. Exposing and Expelling Pre-Conceived Notions

Project Owners believe Contractors to be _____________.

  • Architects believe Contractors to be _________________.
  • Contractors believe Architects to be _________________.
  • Contractors believe Owners to be ___________________.

Great, but how can this help me?

This is probably the  first thing on your mind after reading this Blog.   How about asking us?  The first call is free!  Just email me to set it up.  Don’t wait, get The Crispian Advantage working for you!. If our conversation leaves you needing more, we offer at a reasonable fee telephone and video coaching on change, alignment, and personal and executive performance that improve the bottom line.  If that still doesn’t do it, we’ll work with you on a solution.

Meetings Bloody Meetings

 Meetings Bloody Meetings

Interactive Skills Series – Part Four

Meetings Bloody Meetings


This is the fourth in my series to help people assess how good their interactive skills are. This series is based on research of common commercial interactions that has led to many useful insights into how to create and manage effective meetings, deal with those who are most difficult to persuade – Low Reactors. This week I am focusing on those behaviors we all use most.

Clarifying Behaviors are those which exchange information, facts and opinions and, of course clarification. For Today we will consider, the four main behaviors which when used to observing meetings led to practical insights for anyone who is dreading attending yet another meeting this week J

  • Testing Understanding– checking to see if an earlier contribution has been understood
  • Summarizing – restating in a compact form previous discussions or events
  • Seeking Information – seeks facts opinions, feelings or clarification from others
  • Giving Information – offers facts , opinions or clarification to others

Over the years these four main categories have been developed into behavior groups especially Seeking the Behaviors which have led to some of the most important research on successful persuasion which I will cover in a later program.

But, for now I want to help the listeners diagnose their meetings and how too much, too little or the wrong balance can waste time and often make meetings very frustrating and ineffective

Which of these four behaviors do we tend to use most?

Usually the most common of all the behaviors we are discussing in this series will be Giving Information. In some cases this can be as high as 50%

What happens when you get over that level?

The first thing; participants’ ratings of the meeting change negatively is when a meeting has a high level of GI is Time Wasting. It happens when everyone in the meeting wants to add yet another reason, anecdote or opinion as to why an initiative should or should not be pursued. All of which tend not to help the decision making process

The second rating; that increases is that the meeting is Confusing and Divergent – This is especially true where Testing Understanding & Summasrizing are low. People often say things like it was like “swimming in syrup”. Points become disconnected, the meeting wanders and meeting participants become confused. You know when this happens because you will have another meeting to decide what was decided at the last meeting –

I have been in meetings where people drone on about themselves which feels like they are trying to puff themselves up.

Do you have any research to say what is going on when this happens?

Anyone who is a high information giver is frequently seen as less interested in others views than putting forward their own. This also often means they try to push their own proposals. When everyone is high on Giving Information it feels like there’s a whole set of mini meetings going on each not really connected with any other

What about Seeking Information – when a meeting is high in this behavior what tends to be the result?

Firstly, it would be rare for Seeking to exceed Giving Information. In fact, participants will perceive a meeting is high in Seeking if it exceeds half the amount of GI. When this happens though participant ratings change in three ways:

  • Fostering interest in others’ views – it’s like they see it as stimulating interest in others views
  • Convergent & Focused – When Seeking is high the connection between each successive point is likely to be clearer. This is because Seeking explores a point already made which then creates a connection to the previous contribution or asks for another pint. These meetings are also tending to be focused.
  • Time Saving –you would think that meetings with a lot of questions would take longer to resolve issues that those with fewer questions –this is not the case. There is a positive correlation between people’s perception of whether a meeting saved time and the volume of SI

Testing Understanding  explores understanding of previous contributions. It ties down and clarifies points which may be unclear or ambiguous. As importantly it is used to check that people are seeing things the same way. When levels are high, people rate the meeting as:

  • Fair – a fair hearing
  • Clearwhen combined with Summarizing
  • Rationalvs. levels of DA

Summarizing – Defined as a compact restatement – be careful- It’s not extended repetition or introducing new material under the umbrellas of “summarizing”

High Summarizing Meetings are rated as:

  • Structured
  • Clear
  • Controlled

These last two behaviors seem to perform similar functions in terms of clarifying and organizing what has been discussed.

So, What happens when both these are high?

Research was carried out to correlate the number of misunderstandings and misinterpretations that occurred after the meeting with the amount of Testing Understanding and Summarizing during meetings. In all, 49 Meetings were observed involving 297partiipants.

Those Meetings low in TU & SUM had significantly more errors and omissions in people’s accounts of the principle decisions agreed to in the meeting. As meetings differ in length the researchers took TU & SUM as a percentage total meeting behavior.

The findings are rather disturbing:

  • <2.5% – TU SUM  Average 4.3 errors or omissions
  • >10%+ TU SUM – Average 1.2 errors or omissions

So, what recommendations would you make?

To get a clear understanding and consensus on what was decided approximately 1 in 10 behaviors needs to be TU or SUM

How can people get better control of their meetings in terms of clarifying behaviors?

If you look at the current condition of your meetings, ask yourself what you need to do differently, for example:

Not making enough of the brains round the table – So. you want to create more curiosity of what the lower contributors have to say. Then use Testing Understanding where such a person reacts non-verbally e.g.

“Joan, you seem to be shaking your head about Peter’s last point – Am I right?”

Another tactic is straight forward you bring in people by Seeking –

“Joan, in our experience what do you see as the pros and cons of Peter’s position?”

What if I am frustrated with going over what was covered in previous meetings?

Certainly Summarizing will help, but if you are not the Chairperson, you will need to make a Procedural Proposal.

“Bill (addressing the Chair), At the end of the meeting can we ensure we summarize what we agree to doing before the next meeting”

Great, but how can this help me?

This is probably the first thing on your mind after reading this Blog.
How about asking us?  The first call is free!  Just email me to set it up.
Don’t wait, get The Crispian Advantage working for you!. If our conversation leaves you needing more, we offer at a reasonable fee telephone and video coaching improve bottom line results.
If that still doesn’t do it, we’ll work with you on a solution.

_________________________________________________________________________
For Help in Getting Your People on the Same Page
Nick Anderson, The Crispian Advantage

E-mail I Web I Linkedin

© Copyright All Rights Reserved, The Crispian Advantage and Walk the Talk – A Blog for Agile Minds, [2010-2012]. Unauthorized use and/or duplication of this material without express and written permission from this blog’s author and/or owner is strictly prohibited. Excerpts and links may be used, provided that full and clear credit is given to Nick Anderson, The Crispian Advantage and Walk the Talk – A Blog for Agile Minds with appropriate and specific direction to the original content.